{"id":176119,"date":"2024-10-19T10:55:08","date_gmt":"2024-10-19T10:55:08","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/icc-ipsdc-2018\/"},"modified":"2024-10-25T03:09:08","modified_gmt":"2024-10-25T03:09:08","slug":"icc-ipsdc-2018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/icc\/icc-ipsdc-2018\/","title":{"rendered":"ICC IPSDC 2018"},"content":{"rendered":"
This companion to the IPC includes provisions for design, installation, and inspection of private sewage disposal systems, and provides flexibility in the development of safe systems.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | 2018 IPSDC\u00ae INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE\u00ae <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | 2018 IPSDC\u00ae TITLE PAGE <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | COPYRIGHT <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | PREFACE <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | EFFECTIVE USE OF THE INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | TABLE OF CONTENTS <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | CHAPTER 1 SCOPE AND ADMINISTRATION PART 1\u2014SCOPE AND APPLICATION SECTION 101 GENERAL SECTION 102 APPLICABILITY <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | PART 2\u2014ADMINISTRATION AND ENFORCEMENT SECTION 103 DEPARTMENT OF PRIVATE SEWAGE DISPOSAL INSPECTION <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | SECTION 104 DUTIES AND POWERS OF THE CODE OFFICIAL SECTION 105 APPROVAL <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | SECTION 106 PERMITS <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | SECTION 107 INSPECTIONS <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | SECTION 108 VIOLATIONS SECTION 109 MEANS OF APPEAL <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | SECTION 110 TEMPORARY EQUIPMENT, SYSTEMS AND USES <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | CHAPTER 2 DEFINITIONS SECTION 201 GENERAL SECTION 202 GENERAL DEFINITIONS <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | CHAPTER 3 GENERAL REGULATIONS SECTION 301 GENERAL SECTION 302 SPECIFIC LIMITATIONS SECTION 303 FLOOD HAZARD AREAS SECTION 304 ALTERNATIVE ENGINEERED DESIGN <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | CHAPTER 4 SITE EVALUATION AND REQUIREMENTS SECTION 401 GENERAL SECTION 402 SLOPE SECTION 403 SOIL BORINGS AND EVALUATION <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | SECTION 404 PERCOLATION OR PERMEABILITY EVALUATION <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | SECTION 405 SOIL VERIFICATION <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | SECTION 406 SITE REQUIREMENTS TABLE 406.1 MINIMUM HORIZONTAL SEPARATION DISTANCES FOR SOIL ABSORPTION SYSTEMS <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | FIGURE 406.7.3 CONCEPTUAL DESIGN SKETCH FOR ALTERING SLOPES <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | CHAPTER 5 MATERIALS SECTION 501 GENERAL SECTION 502 IDENTIFICATION SECTION 503 PERFORMANCE REQUIREMENTS SECTION 504 TANKS TABLE 504.3 TANK CAPACITY <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | SECTION 505 PIPE, JOINTS AND CONNECTIONS TABLE 505.1 PRIVATE SEWAGE DISPOSAL SYSTEM PIPE TABLE 505.1.1 DISTRIBUTION PIPE <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | SECTION 506 PROHIBITED JOINTS AND CONNECTIONS <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | CHAPTER 6 SOIL ABSORPTION SYSTEMS SECTION 601 GENERAL SECTION 602 SIZING SOIL ABSORPTION SYSTEMS SECTION 603 RESIDENTIAL SIZING TABLE 603.1 MINIMUM ABSORPTION AREA FOR ONE- AND TWO-FAMILY DWELLINGS SECTION 604 OTHER BUILDING SIZING EQUATION 6-1 TABLE 604.1(1) MINIMUM ABSORPTION AREA FOR OTHER THAN ONE- AND TWO-FAMILY DWELLINGS <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | TABLE 604.1(2) CONVERSION FACTOR <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | TABLE 604.1(2)\u2014continued CONVERSION FACTOR SECTION 605 INSTALLATION OF CONVENTIONAL SOIL ABSORPTION SYSTEMS TABLE 605.3 EFFECTIVE SQUARE-FOOT ABSORPTION AREA FOR SEEPAGE PITS <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | CHAPTER 7 PRESSURE DISTRIBUTION SYSTEMS SECTION 701 GENERAL SECTION 702 DESIGN LOADING RATE TABLE 702.1 SOIL REQUIRED TABLE 702.2 DESIGN LOADING RATE SECTION 703 SYSTEM DESIGN <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | FORMULA 7-1 TABLE 703.3 HAZEN-WILLIAMS FRICTION FACTOR EQUATION 7-1 EQUATION 7-2 EQUATION 7-3 SECTION 704 BED AND TRENCH CONSTRUCTION SECTION 705 PUMPS <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | SECTION 706 DOSING TABLE 706.1 ESTIMATED VOLUME FOR VARIOUS DIAMETER PIPES <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | CHAPTER 8 TANKS SECTION 801 GENERAL SECTION 802 SEPTIC TANKS AND OTHER TREATMENT TANKS TABLE 802.7.1 SEPTIC TANK CAPACITY FOR ONE- AND TWO-FAMILY DWELLINGS <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | TABLE 802.8 MINIMUM HORIZONTAL SEPARATION DISTANCES FOR TREATMENT TANKS TABLE 802.11.1 PUMP CHAMBER SIZES SECTION 803 MAINTENANCE AND SLUDGE DISPOSAL <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | TABLE 802.7.2 ADDITIONAL CAPACITY FOR OTHER BUILDINGS <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | TABLE 802.7.2\u2014continued ADDITIONAL CAPACITY FOR OTHER BUILDINGS SECTION 804 CHEMICAL RESTORATION SECTION 805 HOLDING TANKS TABLE 805.2 MINIMUM LIQUID CAPACITY OF HOLDING TANKS <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | CHAPTER 9 MOUND SYSTEMS SECTION 901 GENERAL SECTION 902 SOIL AND SITE REQUIREMENTS TABLE 902.2 MINIMUM SOIL DEPTHS FOR MOUND SYSTEM INSTALLATION SECTION 903 SYSTEM DESIGN <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | EQUATION 9-1 EQUATION 9-2 EQUATION 9-3 EQUATION 9-4 EQUATION 9-5 <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | TABLE 903.1(1) DESIGN CRITERIA FOR A MOUND FOR A ONE-BEDROOM HOME ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL TABLE 903.1(2) DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | TABLE 903.1(3) DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | TABLE 903.1(4) DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 6-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR SLOWLY PERMEABLE SOIL TABLE 903.1(5) DESIGN CRITERIA FOR A ONE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | TABLE 903.1(5)\u2014continued DESIGN CRITERIA FOR A ONE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK TABLE 903.1(6) DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | TABLE 903.1(6)\u2014continued DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK TABLE 903.1(7) DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | TABLE 903.1(8) DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR SHALLOW PERMEABLE SOIL OVER CREVICED BEDROCK TABLE 903.1(9) DESIGN CRITERIA FOR A ONE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | TABLE 903.1(9)\u2014continued DESIGN CRITERIA FOR A ONE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 150 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE TABLE 903.1(10) DESIGN CRITERIA FOR A TWO-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 300 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | TABLE 903.1(11) DESIGN CRITERIA FOR A THREE-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 450 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE TABLE 903.1(12) DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | TABLE 903.1(12)\u2014continued DESIGN CRITERIA FOR A FOUR-BEDROOM HOME FOR A MOUND ON A 0- TO 12-PERCENT SLOPE WITH LOADING RATES OF 600 GALLONS PER DAY FOR PERMEABLE SOIL WITH A HIGH WATER TABLE EQUATION 9-6 EQUATION 9-7 TABLE 903.5.5 DOWNSLOPE AND UPSLOPE WIDTH CORRECTIONS FOR MOUNDS ON SLOPING SITES EQUATION 9-8 TABLE 903.6 INFILTRATIVE CAPACITY OF NATURAL SOIL EQUATION 9-9 EQUATION 9-10 EQUATION 9-11 EQUATION 9-12 <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | SECTION 904 CONSTRUCTION TECHNIQUES <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | CHAPTER 10 CESSPOOLS SECTION 1001 GENERAL <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | CHAPTER 11 RESIDENTIAL WASTEWATER SYSTEMS SECTION 1101 GENERAL <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | CHAPTER 12 INSPECTIONS SECTION 1201 GENERAL SECTION 1202 INSPECTIONS <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | CHAPTER 13 NONLIQUID SATURATED TREATMENT SYSTEMS SECTION 1301 GENERAL <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | CHAPTER 14 REFERENCED STANDARDS ASTM <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | CISPI CSA ICC NSF <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | UL <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | APPENDIX A SYSTEM LAYOUT ILLUSTRATIONS FIGURE A-1 (SECTION 403.1.1) EXAMPLE OF SOIL-BORING LOCATIONS FOR TWO CONTIGUOUS ABSORPTION AREAS FIGURE A-2 (SECTION 405.2.4) MONITORING WELL DESIGN <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | FIGURE A-3 (SECTION 406.6.7) DESIGN OF FILLED AREA SYSTEM FIGURE A-4 (SECTION 605.7) OBSERVATION PIPE <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | FIGURE A-5 (SECTION 703.1) PRESSURE DISTRIBUTION SYSTEM DESIGN FIGURE A-6 (SECTION 903.1) MOUND USING THREE TRENCHES FOR ABSORPTION AREA <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | FIGURE A-7 (SECTION 903.1) PLAN VIEW OF MOUND USING A BED FOR THE ABSORPTION AREA FIGURE A-8 (SECTION 903.1) CROSS SECTION OF A MOUND SYSTEM USING THREE TRENCHES FOR THE ABSORPTION AREA <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | FIGURE A-9 (SECTION 903.1) CROSS SECTION OF A MOUND SYSTEM USING A BED FOR THE ABSORPTION AREA FIGURE A-10 (SECTION 903.1) DISTRIBUTION PIPE LAYOUT <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | APPENDIX B TABLES FOR PRESSURE DISTRIBUTION SYSTEMS TABLE B-1 REQUIRED DISTRIBUTION PIPE DIAMETERS FOR VARIOUS HOLE DIAMETERS, HOLE SPACINGS AND DISTRIBUTION PIPE LENGTHS (SCHEDULE 40 PLASTIC PIPE) TABLE B-2a DISTRIBUTION PIPE DISCHARGE RATE <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | TABLE B-3 RECOMMENDED MANIFOLD DIAMETERS FOR VARIOUS MANIFOLD LENGTHS, NUMBER OF DISTRIBUTION PIPES AND DISTRIBUTION PIPE DISCHARGE RATES (SCHEDULE 40 PLASTIC PIPE) TABLE B-4a PUMP DOSING RATE <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | TABLE B-5 FRICTION LOSSa IN SCHEDULE 40 PLASTIC PIPE (C = 150) <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | TABLE B-5\u2014continued FRICTION LOSSa IN SCHEDULE 40 PLASTIC PIPE (C = 150) TABLE B-6a MINIMUM DOSE VOLUME BASED ON PIPE SIZE, LENGTH AND NUMBER <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | INDEX <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | ICC MEMBERSHIP BENEFITS THAT WORK FOR YOU <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | ICC EVALUATION SERVICE <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | ICC UNIVERSITY <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | GET IMMEDIATE DOWNLOADS OF THE STANDARDS YOU NEED <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" International Private Sewage Disposal Code<\/b><\/p>\n |