ASCE 9780784408285 2006
$38.46
Preparing for Design-Build Projects
Published By | Publication Date | Number of Pages |
ASCE | 2006 | 295 |
Gransberg, Koch, and Molenaar offer professional reference that covers the basics of developing a design-build requests for qualification and requests for proposals.
PDF Catalog
PDF Pages | PDF Title |
---|---|
6 | Contents |
10 | Foreword |
12 | Preface |
14 | Acknowledgments |
16 | ONE: INTRODUCTION TO DESIGN-BUILD CONTRACTING |
17 | Design-Build: What and Why |
28 | Historical Perspective |
32 | Why Use Design-Build? |
43 | Design-Build Success Factors References |
46 | TWO: DEVELOPING DESIGN-BUILD PROJECT SCOPE |
48 | Design-Build Project Characteristics |
63 | Influencing the Development of Design-Build Project Scope |
72 | Design-Build Contract Model |
76 | Formalizing Project Scope |
80 | Summary References |
82 | THREE: WRITING DESIGN-BUILD PERFORMANCE CRITERIA |
84 | Owner Objectives |
86 | Performance Criteria Development |
88 | Management Criteria |
102 | Schedule Criteria |
105 | Technical Criteria |
110 | Cost Criteria |
123 | Using Abductive Reasoning to Write Performance Criteria |
129 | Design Risk Allocation through Performance Criteria |
130 | References |
134 | FOUR: PREPARING DESIGN-BUILD REQUESTS FOR QUALIFICATIONS OR REQUESTS FOR PROPOSALS |
136 | Design-Build Risk Types |
145 | Applied Risk Management in Design-Build |
148 | Contracting Strategy |
155 | Request for Qualifications/Request for Proposal Content |
158 | Request for Proposal Components |
162 | Design-Build Request for Proposal Contract Clause Considerations |
171 | Design-Build Award Events |
174 | Summary |
175 | References |
176 | FIVE: DESIGN-BUILD REQUESTS FOR PROPOSAL CASE STUDIES Case 5-1: To Spec or Not to Spec—Is That the Question? |
178 | Case 5-2: Keep Looking Until You Find the Right Answer |
180 | Case 5-3: All the Right Moves |
181 | Case 5-4: Trust Me. I Know This Will Work |
185 | Summary |
186 | SIX: SELECTION PROCESS REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSALS EVALUATION PLANNING |
188 | Award Methods |
194 | Selection and Award Processes |
202 | Comparison of Methods |
205 | Evaluation Criteria |
208 | Scoring/Rating Systems |
224 | The Rating Process |
229 | Evaluation Documentation |
235 | Summary References |
240 | SEVEN: DESIGN-BUILD PROPOSAL EVALUATION CASE STUDIES Case 7-1: Let Me Really Strut My Stuff |
243 | Case 7-2: Making a Passing Grade |
245 | Case 7-3: A Bracing Thought |
246 | Case 7-4: Bait and Switch? |
248 | Case 7-5: Defending the System |
251 | Summary |
252 | EIGHT: PREPARING DESIGN-BUILD PROPOSALS Design-Build Proposal Preparation Sequence |
257 | Proposal Preparation by the General Contractor |
260 | Proposal Preparation by the Designer-of-Record |
261 | Preparing the Price Proposal |
263 | Closure of the Proposal Preparation Process |
265 | Summary |
266 | NINE: SUMMARY OF DESIGN-BUILD CONTRACTING Design-Build Basic Concepts |
269 | The Future of Design-Build |
270 | Reference |
272 | Appendix 1: A Design-Builder’s Perspective on the Design-Build Request for Proposal Process in the Transportation Industry |
276 | Appendix 2: A Design-Builder’s Perspective on the Design-Build Request for Proposal Process in the Building Construction Industry |
282 | Appendix 3: Sample Design-Build Contract Documents |
284 | Index A B |
285 | C |
286 | D |
287 | E F G H |
288 | I J L M N |
289 | O P |
290 | Q |
291 | R S |
292 | T U |
293 | V W |
294 | About the Authors |