ASCE Pipelines 2012
$83.42
Pipelines 2012 – Innovations in Design, Construction, Operations, and Maintenance, Doing More with Less
Published By | Publication Date | Number of Pages |
ASCE | 2012 | 1552 |
This collection contains 141 peer-reviewed papers on pipeline infrastructure that were presented at the Pipelines 2012 conference, held in Miami Beach, Florida, August 19-22, 2012.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Cover |
5 | Table of Contents |
21 | Advances in Technology Performance Testing of Underground Storage Tank against Buckling |
31 | Organizing and Managing the Implementation of Large Diameter Tapping and Plugging Technology for a Major Sanitary Improvement Project in Ho Chi Minh City, Vietnam |
41 | Ductile Iron Corrosion Theories and Science |
48 | Design and Development of a Web-Based National Database for Water and Wastewater Pipeline Infrastructure Systems |
58 | Fatigue of Plastic Water Pipe: A Technical Review with Recommendations for PE4710 Pipe Design Fatigue |
81 | Novel Resilience Assessment Methodology for Water Distribution Systems |
90 | Contingency and Emergency: Prior Planning, “Real Live” Execution, and Post Mortem of the Results |
104 | Water Transmission Main Condition Assessment in the Last Frontier: A Magnanimous Endeavor for the Anchorage Water and Wastewater Utility |
122 | Protection of Petroleum and Natural Gas Pipelines Crossing Debris Flow Watersheds—A Case Study in the Qinling Mountains, Western China |
138 | Meeting the Challenge of Pipeline Emergency Repair |
148 | PressureCast Steel Pipe Combined Load Test Set-Up and Execution |
156 | Unidirectional Flushing (UDF): It’s Not Just about Cleaning the System Anymore—Benefits and Advantages That West Springfield, Massachusetts, Achieved with Their Program |
167 | Transmission Main and Plastic Pipe Leak Detection Using Advanced Correlation Technology: Case Studies |
178 | Installation of a 42 Inch HDPE Pipeline at Seminole County’s Regional Water Treatment Facility at Yankee Lake |
187 | Risk Management in Real Time—Transient Control Testing on a Large Conveyance System |
197 | Integration of HDPE 4710 Materials for Potable Water Distribution Systems |
206 | Five Years and Counting: The Evolution of WSSC’s PCCP Management Program |
218 | City of Westminster’s Sewer Collection System Assessment Program: A Case Study |
229 | GIS: A Decision Making Tool for Pipeline Asset Management in Atlanta |
238 | Intake Screen Alternatives for the IPL Project—Planning for Mussels and Variable Intake Depths |
251 | Variability of Pipe Coating Pull-Off Adhesion Measurements on Cylindrical Steel Pipelines |
262 | Evaluation of Statically-Loaded Large Diameter Steel Pipe Embedded with Lime Stabilized Native Clay Soils |
277 | Seismic Fragility Evaluation of Water Pipelines: Part 1— Current Practice |
288 | Coastal Issues Galveston’s Life Line—Considerations When Designing an Aerial Crossing |
298 | Condition Assessment Who Says You Need Multiple Wire Breaks for a PCCP Pipe to Fail? |
308 | Condition Evaluation of Asbestos Cement Water Mains |
318 | Numbers Don’t Lie: PCCP Performance and Deterioration Based on a Statistical Review of a Decade of Condition Assessment Data |
327 | From Pilot to Permanent: Evolution of LWC’s PCCP Condition Assessment Program |
339 | A Methodology for Condition Assessment of Pressure Water Mains |
349 | Implementation of Sustainability Initiatives and the Envision Rating System on the Omaha CSO Program |
359 | PCCP Condition Assessment Methodology: What Is Right for You? |
365 | Enhancing Asset Management Priority Ranking—A Case Study |
376 | Condition Assessment of 23 Lift Stations |
398 | Integrated Monitoring Strategy for Large Diameter Pre- Stressed Concrete Pipelines—A Case Study at Waternet, the Netherlands |
408 | Protecting the Magic City |
416 | Pilot Large Diameter Pipeline Seismic Fragility Assessment |
428 | Restoring Water Network Reliability and Control in the City of Baltimore |
433 | New Approaches to Inspect Water Pipelines Running under Rivers, Lakes, Levies, and Critical Transport Infrastructure |
441 | Reducing the Cost of Failure: Time Is the Unforgiving Enemy during Pipeline Ruptures |
452 | The Problem of Leakage Detection on Large Diameter Mains |
462 | Condition Assessment of a Ductile Iron Force Main Using Guided Wave Technology: Case Study of Underwood Creek Force Main, Milwaukee Metropolitan Sewerage District |
477 | Failure Risk of Bar-Wrapped Pipe with Broken Bars and Corroded Cylinder |
488 | Sewer Main Condition Assessment in the Last Frontier |
501 | LRFD Approach to CFRP Renewal of Prestressed Concrete Cylinder Pipes |
514 | Rehabilitation of Large Diameter PCCP: Relining and Sliplining with Steel Pipe |
525 | Miami-Dade Case Study: Managing and Minimizing Pipeline Outages through the Use of Carbon Fiber |
535 | Field Comparison of the Axis Vacuum Microtunneling Technology vs. Open Cut Excavation in Glenview, Illinois |
543 | Technology—How Far Can We Go? |
551 | Southeast Collector Trunk Sewer Route Selection: The Regional Municipalities of York and Durham, Ontario, Canada |
564 | Consideration of Embodied Energy in Sustainability Evaluation of Pipeline Projects |
572 | Chemical Amendment of Excavated Trench Material for Sustainable Reuse |
582 | Condition Assessments Using Pipe Penetrating Radar: The Metro Wastewater Reclamation District, Denver, CO—Harvard Gulch Interceptor Case Study |
596 | Construction Route Selection for a $2.2 Billion Pipeline |
612 | Replacement of a Critical Water Supply Pipeline in a Dense Urban Landscape |
622 | M-DWASD Design-Build Procurement for Government Cut Pipeline Replacement Project |
633 | Stockton Delta Water Project Construction Challenges |
646 | A New Generation of FRP Laminates for Repair of Pipelines in the Gas Industry |
654 | Design and Construction Challenges for a 36 Inch Diameter 18 Mile Reclaimed Water Pipeline |
664 | Two Successful Installations of Large Diameter Rigid-Design Concrete Pressure Pipelines in Very Soft Soils |
675 | Augmenting Owner’s Staff with As-Needed Contracts for Large Diameter Pipeline Construction Management |
681 | Pipeline Infrastructure Renewal at Miami-Dade Water and Sewer Department |
692 | Delivering a Critical Raw Water Transmission Line Using Design-Build: The Perspective from Gilbert, AZ |
702 | From Tiny Hole to Huge Problem Overnight—Emergency Culvert Pipe Repair |
711 | Lessons Learned from the Commissioning of a 21,000 HP Pump Station in San Diego |
720 | Hiding a 96 Inch Pipeline in Your Neighbor’s Backyard |
733 | Pipe Collapse in an Amusement Park—Now What Do You Do? |
743 | San Francisco Public Utilities Commission’s Water System Improvement Program: Bay Division Pipeline 5 East Bay Reaches—Construction Contract Challenges in a Difficult Economy |
757 | 60″ Demonstration Installation of PressureCast Steel Pipe for the Tarrant Regional Water District |
766 | Replacing Live Pipelines—Planning for Construction Issues and Sequencing Can Keep Your System Up and Running |
777 | Recycled Water for the Thirsty High Desert |
791 | Longest Polyurethane Lined and Coated Steel Pipeline in North America: The Provo Reservoir Canal Enclosure Project |
803 | Experimental Examination of Selected Limit States of Structural Liners at Locations of Ring Fracture |
815 | Reconstruction in an Urban Environment: Kimberley Lane 8″ Water Line HDD and 54″ Sanitary Sewer CIPP Rehabilitation |
825 | Basis of Design for Proposed 42 Inch Reclaimed Water Main |
836 | Repair of a Punctured 48 in. Diameter Prestressed Concrete Cylinder Pipe on a Sixty Degree Slope |
847 | Getting Ready for a Larger Panama Canal—Assessing a Critical Large Diameter Force Main |
856 | Buried Flexible Pipes: Deflections and Stresses Caused by an Increase in Soil Cover—Highway Crossing |
866 | Proactive Upgrade of Steel Pipelines during Scheduled Plant Outages |
877 | Case Study of Productivity Analysis for Horizontal Directional Drilling |
889 | Design Management The Effects of Pipe Stiffness on HDD Pull Loads |
899 | Sustainable Flowable Fill |
909 | How to Accelerate Design and Construction for Large Water Supply Projects |
921 | Collaborative Bidding Approach for the Tollgate Creek Interceptor |
928 | Three Heads Are Better Than One: Efficient Solutions to Achieve the Best Value for a 6 Mile Water Main in an Urban Setting |
938 | Planning and Modeling Solutions for a Complex Collection System: The Baton Rouge SSO Control and Wastewater Facilities Program |
948 | Pipe Materials and Joint Selection for Trenchless Construction |
960 | Classification and Specification of Bedding and Backfill for Buried Pipelines |
972 | Tangent Outlet Design for Welded Steel Pipe |
984 | Molecular Design of High Density Polyethylene for Pipes |
994 | Reinforced Concrete Pipe Design under Extreme Loading Conditions Using ASCE Standard 15-98 and Beyond |
1003 | Untangling the Mysteries of Air Valves |
1010 | Hydraulic Modeling for Emergency Water Supply and Disaster Planning |
1016 | Finite Element Analysis of Combined-Load Performance of PressureCast Steel Pipe |
1035 | Dynamic Behavior of Buried Flexible Pipes of Varying Thickness Using the Shaking Table Test |
1045 | Designing a Critical Interceptor in an Earthquake Prone Floodplain with Limited Access: The Santa Ana River Interceptor Relocation Project |
1056 | Selecting Water Main Materials for the Los Angeles Department of Water and Power |
1066 | Common and Challenging Questions in Water System Infrastructure Management |
1093 | Emergency Relocation of 20 Inch Sewer Force Main (HDD) |
1104 | Introducing a New Honeycomb-FRP Pipe |
1112 | Structural Design of Buried Pipes |
1124 | Surge in a Bi-Directional 48″ Steel, Potable Water Pipeline |
1135 | Failure Mechanisms Design to Prevent Long Running Cracks in Plastic Pipe for Water Applications |
1142 | Operations and Maintenance Scoring and Selecting Rehabilitation Methodologies: How to Pick the Winning Number? |
1149 | Proven Pipeline Rehabilitation System Using Steel Liners for the San Diego County Water Authority |
1156 | Pipe Performance and Experiences during Seismic Events in New Zealand over the Last 25 Years |
1167 | Steel Cylinder Reinforcement (SCR) for Pipeline Repair or Upgrades |
1176 | Determining the Effectiveness of Chlorine-Based Biofilm Control in Large Diameter Pipelines |
1188 | Large Steel Penstock Relining: The Blue Ridge Dam Rehabilitation |
1196 | Cathodic Protection of Ductile Iron and Steel Water Pipelines |
1202 | The Design and Construction Considerations for PCCP Rehabilitation Using FRP Composites |
1212 | The Development of a Novel Steel Reinforced Composite (SRC) Liner for the Rehabilitation of Deteriorated PCCP |
1223 | Can It Handle the Pressure? Condition Assessment, Structural Evaluation, and Repair of an Existing 72 Inch PCCP Pipeline |
1234 | Beyond the Wires: A Sustainable Approach to Prestressed Concrete Cylinder Pipe Management |
1243 | Redeveloping Phoenix’s PCCP Assessment Program: A Pragmatic Approach |
1253 | Interaction of Water Transport Pipelines with Their Surroundings and Third Party Activities |
1265 | Innovative Condition Assessment of Strategic Aqueducts |
1276 | Study on the Applicability of Currently Used Soil-Pipe Interaction Equations for Segmented Buried Pipelines Subjected to Fault Movement |
1285 | Answering 5 Basic Asset Management Questions for Pre-Stressed Concrete Water Transport Mains |
1299 | Refurbishment of the Vyrnwy Large Diameter Trunk Main |
1309 | Synthesis-Analysis of Water and Wastewater Pipeline Condition Assessment and Renewal Engineering Technologies |
1317 | Effect of Wire Breaks on Prestressed Concrete Cylinder Pipe (PCCP) Reinforced with Steel Liners—A Case Study |
1327 | Lessons Learned from the Multi-Year Assessment of the Homestake Transmission Pipeline |
1339 | Locating Water Main Leaks in Texas to Conserve Resources during Times of Drought |
1348 | Estimating Residual Strength of Deteriorated 96″ Interceptor and Strength Enhancement Provided by Lining Methods Using Computer Modeling and Forensic Investigation Tools |
1363 | A New Generation of Back-Reamers for HDD Installations in Cohesive and Fine to Medium Coarse Soils |
1375 | Physical Evaluation of the Dissipation of a Concentrated Load When Applied to Reinforced Concrete Pipe |
1388 | CFRP Repair and Strengthening of PCCP for Thrust Restraint |
1397 | Mapping Utility Infrastructure via Underground GPS Positioning with Autonomous Telerobotics |
1411 | WSSC’s Systematic Approach to the CFRP Liner Installation Process |
1422 | Santa Fe Irrigation District (SFID): Group 1 PRS and Valve Replacement Project J921 |
1428 | Metropolitan Utilities District of Omaha PCCP Asset Management Advancements |
1438 | Combining CFRP Lining Systems with Other Pipeline Rehabilitation Technologies |
1448 | Pipeline Hydraulics and Modeling Upper Feeder and San Gabriel Canyon Valve Structure: Hydraulic Transient Analysis |
1458 | Planning and Coordination Opportunities Progress toward a Unified Thrust Restraint Design—An Update |
1470 | Design-Build of Wastewater Force-Main in North Bay Village: Lessons Learned from the Design-Build Team’s Perspective |
1485 | Predictive Modeling Two-Step Subsurface Characterization Process for Pipeline Project in Texas |
1495 | Prestressed Concrete Cylinder Pipe (PCCP) Condition Assessment of LWC’s B.E. Payne 60″ PCCP Pipeline |
1507 | Procurement Alternatives Minden Uses Competitive Bidding with Alternate Pipe Materials on Large Diameter Regional Water System Work |
1517 | Rehabilitative Approaches HDD Matches Installation Method to Long and Difficult Pipe Crossing in Macon, GA |
1527 | Trenchless Evaluation Comparison of Jacking Load Models for Trenchless Pipe Jacking |
1541 | Assessing Sustainability of Pipeline Projects Using Envision Rating System |