BSI 23/30456495 DC 2023
$13.70
BS EN ISO 16122-3. Agricultural and forestry machinery. Inspection of sprayers in use – Part 3. Sprayers for bush and tree crops
Published By | Publication Date | Number of Pages |
BSI | 2023 | 27 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 30456495-NC.pdf |
3 | ISO_DIS 16122-3 ed.2 – id.83370 Enquiry PDF (en).pdf |
7 | Foreword |
9 | Introduction |
11 | 1 Scope 2 Normative references 3 Terms and definitions 4 Requirements and method of verification 4.1 General |
12 | 4.2 Leaks and dripping 4.2.1 Static leaks 4.2.2 Dynamic leaks 4.2.3 Spraying and dripping on parts 4.3 Pump(s) 4.3.1 Capacity |
13 | 4.3.2 Pulsations 4.3.3 Air chamber 4.4 Spray mix agitation 4.4.1 Hydraulic 4.4.2 Mechanical 4.5 Spray tank(s) 4.5.1 Lid |
14 | 4.5.2 Tank filling strainer 4.5.3 Pressure compensation 4.5.4 Tank content indicator(s) 4.5.5 Tank emptying 4.5.6 Tank filling 4.5.7 Induction hopper 4.5.8 Cleaning device for plant protection product containers |
15 | 4.5.9 Cleaning equipment 4.6 Measuring systems, controls and regulation systems 4.6.1 General 4.6.2 Pressure indicator for spray liquid |
16 | 4.6.3 Other measuring devices 4.6.4 Pressure adjusting devices 4.7 Lines (pipes and hoses) 4.8 Filters 4.8.1 Filter presence 4.8.2 Isolating device 4.8.3 Filter insert changeability |
17 | 4.9 Nozzles 4.9.1 Nozzle arrangement 4.9.2 Dripping 4.9.3 Switching off 4.9.4 Adjustment 4.9.5 Pressure drop 4.10 Distribution of pressure and spray liquid flow 4.10.1 Spray boom section pressure equalizer |
18 | 4.10.2 Distribution of spray liquid |
19 | 4.11 Blower 4.11.1 Condition 4.11.2 Adjustability 4.12 Spray guns and lances (if present) 4.12.1 Trigger 4.12.2 Adjustment of flow rate and angle 5 Test methods 5.1 Test facilities |
20 | 5.2 Pumps 5.2.1 Pump capacity test 5.2.2 Pump pulsations 5.3 Sprayer´s pressure indicators 5.3.1 Specification of pressure indicators used for verification |
21 | 5.3.2 Verification method of the sprayer pressure indicator 5.4 Flow meters for controlling the volume/area rate 5.4.1 General 5.4.2 Operating procedure No. 1: Verification by nozzle flow rate measurement |
22 | 5.4.3 Operating Procedure No. 2: Verification by installing a calibrated flow meter in the circuit of the sprayer 5.5 System for controlling forward speed |
23 | 5.6 Flow rate of the spray nozzles 5.6.1 General 5.6.2 Measurement with nozzles fitted on the sprayer 5.6.3 Measurement with nozzles removed from the sprayer 5.6.4 Measurement on spray gun / lance 5.7 Pressure drop |
24 | 5.8 Pressure variation when the spray is switched off 5.9 Pressure distribution |
25 | Annex€ZA (informative) Relationship between this European Standard and the essential health and safety and environmental requirements of Directive 2009/128/EC |
27 | Bibliography |