{"id":162000,"date":"2024-10-19T09:44:49","date_gmt":"2024-10-19T09:44:49","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-mnl-3-16\/"},"modified":"2024-10-25T02:02:04","modified_gmt":"2024-10-25T02:02:04","slug":"aci-mnl-3-16","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-mnl-3-16\/","title":{"rendered":"ACI MNL 3 16"},"content":{"rendered":"
None<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Acknowledgments <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Preface <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | About This Book <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Chapter 1: General Requirements 1.1\u2014General <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 1.2\u2014Criteria for the assessment and design of repair and rehabilitation of existing concrete structures 1.3\u2014Applicability of the Code <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 1.4\u2014Administration 1.5\u2014Responsibilities of the licensed design professional <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 1.6\u2014Construction documents 1.7\u2014Preliminary evaluation <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Chapter 2: Notation And Definitions 2.1\u2014Notation 2.2\u2014Definitions <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Chapter 3: Referenced Standards <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Chapter 4: Basis for Compliance 4.1\u2014General <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 4.2\u2014Compliance method <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 4.3\u2014Unsafe Structural Conditions 4.4\u2014Substantial structural damage 4.5\u2014Conditions of deterioration, faulty construction, or damage less than substantial structural damage <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 4.6\u2014Conditions of Deterioration, Faulty Construction, or Damage Less than Substantial Structural Damage without Strengthening <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 4.7\u2014Additions, 4.8 Alterations, 4.9 Changes in Occupancy <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Chapter 5: Loads, Factored Load Combinations, and Strength Reduction Factors <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 5.1\u2014General <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 5.2\u2014Load factors and factored load combinations 5.3\u2014Strength reduction factors for repair design 5.4\u2014Strength reduction factors for assessment <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 5.5\u2014Additional factored load combinations for structures rehabilitated with external reinforcing systems <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Chapter 6: Assessment, Evaluation, and Analysis 6.1\u2014Structural assessment <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 6.2\u2014Investigation and structural evaluation <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 6.3\u2014Material properties <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 6.4\u2014Test methods to determine or confirm material properties <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 6.5\u2014Structural analysis of existing structures 6.6\u2014Structural serviceability 6.7\u2014Structural analysis for repair design 6.8\u2014Strength evaluation by load testing <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 6.9\u2014Recommendations <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Chapter 7: Design of Structural Repairs 7.1\u2014General 7.2\u2014Strength and serviceability <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 7.3\u2014Behavior of repaired systems <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 7.4\u2014Interface Bond <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Conclusion: <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 7.5\u2014Materials 7.6\u2014Design and detailing considerations <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 7.7\u2014Repair using supplemental post-tensioning <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 7.8\u2014Repair using fiber-reinforced polymer (FRP) composites <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 7.9\u2014Performance under fire and elevated temperatures <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | Chapter 8: Durability 8.1\u2014General <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | 8.2\u2014Cover 8.3\u2014Cracks <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | 8.4\u2014Corrosion 8.5\u2014Surface treatments and coatings <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Chapter 9: Construction 9.1\u2014General 9.2\u2014Stability and temporary shoring requirements <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | 9.3\u2014Temporary conditions <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | 9.4\u2014Environmental issues <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Chapter 10: Quality Assurance 10.1\u2014General <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | 10.2\u2014Inspection 10.3\u2014Testing of repair materials 10.4\u2014Construction observations <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | Chapter 11: Commentary References <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | Appendix A\u2014Criteria When Using ACI 562 As A Stand-Alone Code A.1\u2014General A.2\u2014Design-basis code criteria <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | A.3\u2014Unsafe structural conditions <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | A.4\u2014Substantial structural damage <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | A.5\u2014Conditions of deterioration, faulty construction, or damage less than substantial structural damage <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | A.6\u2014Conditions of deterioration, faulty construction, or damage less than substantial structural damage without strengthening <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | A.7\u2014Additions <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | A.8\u2014Alterations A.9\u2014Changes in occupancy <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | Project Examples <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | Project Example No. 1\u2014Typical Parking Structure Repair Description of structure Project initiation and objectives <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | Governing building codes <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | Preliminary evaluation Investigation of existing site conditions <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | Capacity and demand of the existing structure <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | Findings of preliminary evaluation Area 1 <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | Area 2 <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | Report to owner <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | Structural evaluation Existing conditions Structural analysis for repair design <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | Area 1 <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | Area 2 Design of structural repairs and durability Slab area 1 <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | Slab Area 2 and columns <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | Slab soffit repairs Contract documents Construction <\/td>\n<\/tr>\n | ||||||
98<\/td>\n | Quality assurance Project close-out Periodic maintenance Record documents <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | Project Example No. 2\u2014Typical Fa\u00e7ade Repair Description of structure <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | Project initiation and objectives Governing building codes <\/td>\n<\/tr>\n | ||||||
101<\/td>\n | Preliminary observations and evaluation <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | Observed concrete conditions <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | Laboratory findings Findings <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | Structural assessment and repair design Shear wall reveal strip repairs <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | North and south walls away from reveal strips and east and west slab and column edges <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | Balcony repairs <\/td>\n<\/tr>\n | ||||||
108<\/td>\n | Performance under fire and elevated temperatures <\/td>\n<\/tr>\n | ||||||
109<\/td>\n | Contract documents Construction Quality assurance <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | Project close-out Periodic maintenance Record documents <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | Project Example No. 3\u2014Adaptive Reuse of Historic Depot Description of structure <\/td>\n<\/tr>\n | ||||||
112<\/td>\n | Project initiation and objectives Governing building codes <\/td>\n<\/tr>\n | ||||||
113<\/td>\n | Preliminary observations and evaluation Concrete conditions <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | Material evaluation findings Summary <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | Structural assessment Requirement for structural assessment Existing properties Structural analysis <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | Structural analysis findings <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | Recommended repair program Train deck rehabilitation <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | Column rehabilitation <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | Concrete repair details <\/td>\n<\/tr>\n | ||||||
125<\/td>\n | Contract documents Construction Quality Assurance <\/td>\n<\/tr>\n | ||||||
126<\/td>\n | Project close-out Periodic maintenance Record documents <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | Project Example No. 4: Parking\/Plaza Slab Strengthening Description of structure Project initiation and objectives Governing building codes <\/td>\n<\/tr>\n | ||||||
128<\/td>\n | Preliminary evaluation Document review Existing site conditions Strength of as-built structure <\/td>\n<\/tr>\n | ||||||
131<\/td>\n | Compliance method and design basis code <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | Structural assessment Requirement for structural assessment <\/td>\n<\/tr>\n | ||||||
133<\/td>\n | Structural assessment Structural analysis Strengthening concepts Strengthening Concept #1 <\/td>\n<\/tr>\n | ||||||
134<\/td>\n | Strengthening Concept #2 <\/td>\n<\/tr>\n | ||||||
135<\/td>\n | Assessment of strengthening concepts Structural analysis for repair design <\/td>\n<\/tr>\n | ||||||
137<\/td>\n | Design of structural repairs and durability <\/td>\n<\/tr>\n | ||||||
138<\/td>\n | Contract documents Construction Quality assurance <\/td>\n<\/tr>\n | ||||||
141<\/td>\n | Load test <\/td>\n<\/tr>\n | ||||||
142<\/td>\n | Test procedure <\/td>\n<\/tr>\n | ||||||
145<\/td>\n | Test results <\/td>\n<\/tr>\n | ||||||
146<\/td>\n | Project close-out Periodic maintenance Record documents <\/td>\n<\/tr>\n | ||||||
147<\/td>\n | Project Example No. 5\u2014Precast\/Prestressed Double-Tee Repair Description of structure Project initiation and objectives <\/td>\n<\/tr>\n | ||||||
148<\/td>\n | Governing building codes <\/td>\n<\/tr>\n | ||||||
149<\/td>\n | Preliminary evaluation Existing site conditions <\/td>\n<\/tr>\n | ||||||
150<\/td>\n | Design strength of existing structure Findings of preliminary evaluation <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | Design basis code Structural evaluation Existing site conditions <\/td>\n<\/tr>\n | ||||||
152<\/td>\n | Structural analysis for evaluation <\/td>\n<\/tr>\n | ||||||
154<\/td>\n | Structural safety Repair\/replacement options <\/td>\n<\/tr>\n | ||||||
155<\/td>\n | Repair\/replacement Option #1 Repair\/replacement Option #2 Repair\/replacement Option #3 <\/td>\n<\/tr>\n | ||||||
156<\/td>\n | Repair\/replacement Option #4 <\/td>\n<\/tr>\n | ||||||
157<\/td>\n | Evaluation of Repair\/replacement Options Design of strengthening repairs Structural analysis for repair design Design of strengthening repairs <\/td>\n<\/tr>\n | ||||||
159<\/td>\n | Design of structural repairs and durability Development and bond of CFRP strips <\/td>\n<\/tr>\n | ||||||
160<\/td>\n | Acceptance of CFRP repairs by the authorities having jurisdiction Durability of repairs Aesthetics of repairs Contract documents Construction <\/td>\n<\/tr>\n | ||||||
163<\/td>\n | Quality assurance <\/td>\n<\/tr>\n | ||||||
164<\/td>\n | Project close-out Periodic maintenance Record documents <\/td>\n<\/tr>\n | ||||||
165<\/td>\n | Referenced Standards and Reports <\/td>\n<\/tr>\n | ||||||
168<\/td>\n | Compliance Methods in the 2015 IEBC <\/td>\n<\/tr>\n | ||||||
172<\/td>\n | Provision Coverage Matrix <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" MNL-3(16) Guide to the Code for Assessment, Repair, and Rehabilitation of Existing Concrete Structures<\/b><\/p>\n |