{"id":239475,"date":"2024-10-19T15:39:53","date_gmt":"2024-10-19T15:39:53","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iec-ts-62668-22016\/"},"modified":"2024-10-25T10:22:10","modified_gmt":"2024-10-25T10:22:10","slug":"bsi-pd-iec-ts-62668-22016","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iec-ts-62668-22016\/","title":{"rendered":"BSI PD IEC\/TS 62668-2:2016"},"content":{"rendered":"

This part of IEC 62668, which is a technical specification, defines requirements for avoiding the use of counterfeit, recycled and fraudulent components when these components are not purchased from the original component manufacturer (OCM) or are purchased from outside of franchised distributor networks for use in the aerospace, defence and high performance (ADHP) industries. This practice is used, as derogation, only when there are no reasonable or practical alternatives.<\/p>\n

\n

NOTE Typically this technical specification is used in conjunction with IEC TS 62239-1 and IEC TS 62668-1,<\/p>\n<\/blockquote>\n

enabling ADHP industries to manage and avoid the use of counterfeit, recycled and fraudulent components in their supply chains.<\/p>\n

Although developed for the ADHP industry, this document may be used by other high-performance and high-reliability industries, at their discretion.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nCONTENTS <\/td>\n<\/tr>\n
6<\/td>\nFOREWORD <\/td>\n<\/tr>\n
8<\/td>\nINTRODUCTION <\/td>\n<\/tr>\n
9<\/td>\n1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions <\/td>\n<\/tr>\n
14<\/td>\n3.2 Abbreviated terms <\/td>\n<\/tr>\n
15<\/td>\n4 Technical requirements
4.1 General
4.2 Overview
Figures
Figure 1 \u2013 Suspect components perimeter <\/td>\n<\/tr>\n
16<\/td>\n4.3 Risks associated with purchasing from non-franchised distributors
4.3.1 General
4.3.2 Risk origins <\/td>\n<\/tr>\n
17<\/td>\n4.3.3 Quality risks
4.3.4 Industrial risks <\/td>\n<\/tr>\n
18<\/td>\n4.3.5 Reliability risks
4.3.6 Financial risks
4.3.7 Legal risk
4.4 Reasons to initialize the derogation process
4.4.1 General
4.4.2 Obsolescence notice failure <\/td>\n<\/tr>\n
19<\/td>\n4.4.3 Allocation
4.4.4 Insufficient end-of-life inventory
4.4.5 Late orders
4.4.6 Minimum order quantity
4.4.7 Technical requirements
4.5 Derogation process
4.5.1 Notification to the OEM <\/td>\n<\/tr>\n
20<\/td>\nFigure 2 \u2013 Derogation process when supplying from non-franchised distribution <\/td>\n<\/tr>\n
21<\/td>\n4.5.2 Analysis of alternative solutions
Figure 3 \u2013 Potential avionics supply chain scenarios <\/td>\n<\/tr>\n
22<\/td>\n4.5.3 List of approved non-franchised distributors
4.5.4 Non-franchised distributor consultation <\/td>\n<\/tr>\n
23<\/td>\n4.5.5 Risk analysis
Tables
Table 1 \u2013 Typical procurement risk scenarios and guidance for procurement risk assessment <\/td>\n<\/tr>\n
25<\/td>\n4.5.6 Non-franchised distributor order authorization <\/td>\n<\/tr>\n
26<\/td>\n4.5.7 Order processing
4.5.8 Incoming processing <\/td>\n<\/tr>\n
28<\/td>\nTable 2 \u2013 Typical testing <\/td>\n<\/tr>\n
30<\/td>\n4.5.9 Records
4.5.10 Processing during storage and manufacturing
4.5.11 Failed electronic components <\/td>\n<\/tr>\n
31<\/td>\nAnnexes
Annex A (informative) Flowchart of IEC TS 62668-1 requirements
Figure A.1 \u2013 Flowchart of IEC\u00a0TS\u00a062668-1 requirements <\/td>\n<\/tr>\n
32<\/td>\nAnnex B (informative) Example of detailed tests list, linked with procurement risks levels
Table B.1 \u2013 Example of detailed revalidation testing of suspect stock <\/td>\n<\/tr>\n
40<\/td>\nAnnex C (informative) iNEMI assessment methodology and metric development <\/td>\n<\/tr>\n
41<\/td>\nAnnex D (informative) Summary of SAE AS6171 proposed test methods under consideration by SAE International
Table D.1 \u2013 Summary of SAE AS6171 test methods (under considerations) <\/td>\n<\/tr>\n
44<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Process management for avionics. Counterfeit prevention – Managing electronic components from non-franchised sources<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2016<\/td>\n50<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":239476,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-239475","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/239475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/239476"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=239475"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=239475"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=239475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}