{"id":255345,"date":"2024-10-19T16:52:46","date_gmt":"2024-10-19T16:52:46","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iec-ts-60870-5-6012015\/"},"modified":"2024-10-25T12:19:54","modified_gmt":"2024-10-25T12:19:54","slug":"bsi-pd-iec-ts-60870-5-6012015","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iec-ts-60870-5-6012015\/","title":{"rendered":"BSI PD IEC\/TS 60870-5-601:2015"},"content":{"rendered":"
This part of IEC 60870describes test cases for conformance testing of telecontrol equipment, Substation Automation Systems (SAS) and telecontrol systems, including front-end functions of SCADA.<\/p>\n
The use of this part of IEC 60870 facilitates interoperability by providing a standard method of testing protocol implementations, but it does not guarantee interoperability of devices. It is expected that using this part of IEC 60870 during testing will minimize the risk of noninteroperability.<\/p>\n
The goal of this part of IEC 60870 is to enable unambiguous and standardised evaluation of IEC 60870-5 companion standard protocol implementations. The guidelines and conditions for the testing environment are described in IEC 60870-5-6. The detailed test cases per companion standard, containing among others mandatory and optional mandatory test cases per Basic Application Function, ASDU and transmission procedures, will become available as a technical specification (TS). Other functionality may need additional test cases but this is beyond the scope of this part of IEC 60870. For proper testing, it is recommended to define these additional test cases.<\/p>\n
This part of IEC 60870 deals mainly with communication conformance testing; therefore other requirements, such as safety or EMC are not covered. These requirements are covered by other standards (if applicable) and the proof of compliance for these topics is done in accordance with these standards.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 3 Terms and definitions 4 Abbreviated terms 5 Conformance testing for IEC 60870-5-101 5.1 Overview and legend <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Figures Figure 1 \u2013 Test procedure <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.2 Configuration parameters for IEC 60870-5-101 Tables Table 1 \u2013 Configuration Parameters for IEC\u00a060870-5-101 <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.3 Verification of IEC 60870-5-101 communication Table 2 \u2013 Verification of the physical level Table 3 \u2013 Verification of the Link Level (1 of 4) <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Table 4 \u2013 Verification of the Data Unit Identifier Table 5 \u2013 Verification of the object address <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Table 6 \u2013 Verification of ASDUs for process information in monitor (Normal) direction (1 of 19) <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Table 7 \u2013 Verification of ASDUs for process information in control (Normal) direction (1\u00a0of\u00a02) <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Table 8 \u2013 Verification of ASDUs for system information in monitor (Normal) direction Table 9 \u2013 Verification of ASDUs for system information in control (Normal) direction (1\u00a0of\u00a02) <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Table 10 \u2013 Verification of ASDUs for parameters in control (Normal) direction (1 of 2) <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Table 11 \u2013 Verification of ASDUs for file transfer (in monitor (Normal) and control direction) (1 of 3) <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 5.4 Conformance Test Procedures Table 12 \u2013 Link Layer Conformance Test Procedures <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Table 13 \u2013 Data Unit Identifier Conformance Test Procedures (1 of 2) <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Table 14 \u2013 Information object address Conformance Test Procedures <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Table 15 \u2013 Station initialization function (unbalanced systems) Conformance Test Procedures (1 of 4) <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | Table 16 \u2013 Data acquisition by polling function (unbalanced systems) Conformance Test Procedures <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | Table 17 \u2013 Station initialization function (balanced systems) Conformance Test Procedures (1 of 4) <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | Table 18 \u2013 Redundant link conformance test procedures <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | Table 19 \u2013 Cyclic data transmission function Conformance Test Procedures <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | Table 20 \u2013 Data acquisition through Read function Conformance Test Procedures <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | Table 21 \u2013 Acquisition of events function Conformance Test Procedures (1 of 2) <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | Table 22 \u2013 General interrogation function Conformance Test Procedures (1 of 5) <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | Table 23 \u2013 Clock synchronization function conformance test procedures (1 of 2) <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Table 24 \u2013 Command transmission function Conformance Test Procedures (1 of 7) <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | Table 25 \u2013 Transmission of integrated totals (telecounting) function Conformance Test Procedures (1 of 4) <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | Table 26 \u2013 Parameter loading function Conformance Test Procedures (1 of 2) <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | Table 27 \u2013 Test procedure function Conformance Test Procedures <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | Table 28 \u2013 File transfer procedure function Conformance Test Procedures (1 of 2) <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | Table 29 \u2013 Delay acquisition procedure function conformance test procedures <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | Table 30 \u2013 Additional Conformance Test Procedures <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | Table 31 \u2013 Negative Conformance Test Procedures <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | Table 32 \u2013 PIXIT related Conformance Test Procedures <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | 5.5 Test results chart Table 33 \u2013 Test results chart (1 of 8) <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | 5.6 Test results of command transmission <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | Table 34 \u2013 Test results of single command transmission <\/td>\n<\/tr>\n | ||||||
98<\/td>\n | Table 35 \u2013 Test results of double command transmission (1 of 2) <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | Table 36 \u2013 Test results of regulating step command transmission (1 of 2) <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | Table 37 \u2013 Test results of setpoint command transmission <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Telecontrol equipment and systems – Transmission protocols. Conformance test cases for the IEC 60870-5-101 companion standard<\/b><\/p>\n |