{"id":271712,"date":"2024-10-19T18:13:11","date_gmt":"2024-10-19T18:13:11","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-128072019-tc\/"},"modified":"2024-10-25T14:28:17","modified_gmt":"2024-10-25T14:28:17","slug":"bs-en-128072019-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-128072019-tc\/","title":{"rendered":"BS EN 12807:2019 – TC"},"content":{"rendered":"
This document specifies the minimum requirements for the design, construction and testing during manufacture of transportable refillable brazed steel Liquefied Petroleum Gas (LPG) cylinders, of water capacity from 0,5 l up to and including 15 l, exposed to ambient temperatures. This document applies only to cylinders having a circular cross-section without any longitudinal joint.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
39<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 3 Terms, definitions and symbols 3.1 Terms and definitions 3.2 Symbols <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 4 Materials <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 5 Design 5.1 General requirements <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 5.2 Calculation of cylindrical shell thickness 5.3 Design of torispherical and semi-ellipsoidal ends concave to pressure <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 5.4 Design of ends of shapes other than torispherical and semi-ellipsoidal 5.5 Minimum wall thickness <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 5.6 Design of openings 5.7 Valve protection 5.8 Non-pressure containing attachments 6 Construction and workmanship 6.1 Brazing qualification <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 6.2 Plates and pressed parts 6.3 Brazed joints 6.4 Tolerances 6.4.1 Out of roundness <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 6.4.2 Straightness 6.4.3 Verticality 6.5 Heat treatment 6.6 Protective coating 6.7 Closure of openings 7 Tests and examinations 7.1 General 7.2 Types of test and evaluation of the test results <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 7.3 Material testing <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 7.4 Tensile test 7.4.1 Parent material 7.4.1.1 Procedure <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 7.4.1.2 Requirements 7.4.2 Joints 7.4.2.1 Procedure 7.4.2.2 Requirements 7.5 Bend test 7.5.1 Procedure <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 7.5.2 Requirements <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 7.6 Burst test under hydraulic pressure 7.6.1 Procedure <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | 7.6.2 Requirements 7.6.2.1 Bursting pressure 7.6.2.2 Volumetric expansion 7.6.2.3 Type of fracture <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | 7.7 Pressure test 7.7.1 Procedure 7.7.2 Requirements 7.8 Ultrasonic examination 7.8.1 Procedure 7.8.2 Assessment 7.8.3 Requirements 7.9 Macro examination 7.9.1 Procedure <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | 7.9.2 Requirements 7.10 Visual examination of the surface of the joint 7.10.1 Procedure 7.10.2 Requirements 7.11 Fatigue test 7.11.1 Procedure 7.11.2 Requirement 8 Technical requirements for type approval 8.1 Extent of testing <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | 8.2 Cylinder types 8.3 Type approval certificate <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | 9 Production testing and examination requirements 9.1 Tests and examinations applicable to all cylinders 9.2 Ultrasonic examination 9.3 Macro examination 9.4 Examination of the valve boss joint 9.5 Examination of non-pressure containing joints <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 9.6 Unacceptable imperfections found by the ultrasonic or macro examinations 9.7 Batch testing (Mechanical \/ Burst tests) 9.7.1 Batch 9.7.2 Inspection lots 9.7.3 Rate of sampling 9.7.3.1 General <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | 9.7.3.2 Batch less than or equal to 3 000 cylinders 9.7.3.3 Batch over 3 000 cylinders 9.7.3.4 Cylinder less than or equal to 6,5 l 9.7.4 Additional checks <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | 9.8 Failure to meet mechanical and burst test requirements 9.8.1 Mechanical 9.8.2 Burst 9.8.3 Re-test 9.8.4 Resubmission of an inspection lot <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | 10 Marking 11 Certificates <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. LPG equipment and accessories. Transportable refillable brazed steel cylinders for liquefied petroleum gas (LPG). Design and construction<\/b><\/p>\n |