{"id":346853,"date":"2024-10-20T00:23:11","date_gmt":"2024-10-20T00:23:11","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-iec-tr-29110-5-6-22014\/"},"modified":"2024-10-25T23:51:10","modified_gmt":"2024-10-25T23:51:10","slug":"bsi-pd-iso-iec-tr-29110-5-6-22014","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-iec-tr-29110-5-6-22014\/","title":{"rendered":"BSI PD ISO\/IEC TR 29110-5-6-2:2014"},"content":{"rendered":"
1.1<\/b> Fields of application<\/p>\n
This part of ISO\/IEC 29110 is applicable to Very Small Entities (VSEs). VSEs are enterprises, organizations, departments or projects having up to 25 people. The lifecycle processes described in the set of International Standards (IS) and Technical Reports (TR) are not intended to preclude or discourage their use by organizations bigger than VSEs.<\/p>\n
This part of ISO\/IEC 29110 provides the management and engineering guide to the Basic Profile described in ISO\/IEC 29110-4-6 through Project Management and System Definition and realization processes. This part of ISO\/IEC 29110 is a standalone guide; it is not intended for a VSE to use the standardized profile to implement this part of ISO\/IEC 29110.<\/p>\n
This part of ISO\/IEC 29110 applies for non-critical systems development projects. The system development should fulfil the project requirements and the system description.<\/p>\n
Using this part of ISO\/IEC 29110, a VSE can obtain benefits in the following aspects:<\/p>\n
An agreed set of project requirements (technical part of contract) and expected products are agreed by the Acquirer.<\/p>\n<\/li>\n
A disciplined management process, that provides project visibility and corrective actions of project problems and deviations, is performed.<\/p>\n<\/li>\n
A systematic System Definition and Realization process, that satisfies Acquirer needs and ensures quality products, is followed.<\/p>\n<\/li>\n<\/ul>\n
VSEs developing software that is part of a larger system, and for stand-alone software products and services, are encouraged to use the management and engineering guide of the Basic Profile (ISO\/IEC 29110-5-1-2[<\/sup>9<\/sup>]<\/sup>).<\/p>\n 1.2<\/b> Target Audience<\/p>\n This part of ISO\/IEC 29110 is targeted at VSEs who do not develop critical systems and do not have experience with SE process planning and implementation using ISO\/IEC 15288.<\/p>\n It is intended to be used with any processes, techniques and methods that enhance the VSE’s Stakeholder satisfaction and productivity.<\/p>\n Systems Engineering Deployment Packages <\/td>\n<\/tr>\n Mapping between the objectives of ISO\/IEC\u00a0TR\u00a029110-5-6-2 and ISO\/IEC\u00a015288:2008 <\/td>\n<\/tr>\n Systems and software engineering. Lifecycle profiles for Very Small Entities (VSEs) – Systems engineering. Management and engineering guide: Generic profile group: Basic profile<\/b><\/p>\nPDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 6<\/td>\n Foreword <\/td>\n<\/tr>\n \n 7<\/td>\n Introduction <\/td>\n<\/tr>\n \n 8<\/td>\n Table tab_1 <\/td>\n<\/tr>\n \n 9<\/td>\n Figure fig_1 <\/td>\n<\/tr>\n \n 11<\/td>\n Section sec_1
Section sec_1.1
Section sec_1.2
Section sec_2
1\tScope
1.1\tFields of application
1.2\tTarget Audience
2\tNormative references <\/td>\n<\/tr>\n\n 12<\/td>\n Section sec_3
Section sec_3.1
Section sec_3.2
Section sec_3.3
Section sec_3.4
Section sec_3.5
3\tTerms and definitions <\/td>\n<\/tr>\n\n 13<\/td>\n Section sec_3.6
Section sec_3.7
Section sec_3.8
Section sec_3.9
Section sec_3.10
Section sec_3.11
Section sec_3.12 <\/td>\n<\/tr>\n\n 14<\/td>\n Section sec_4
Section sec_4.1
4\tSymbols and abbreviated terms
4.1\tNaming, diagramming and definition conventions <\/td>\n<\/tr>\n\n 15<\/td>\n Section sec_4.2
Section sec_5
4.2\tAbbreviated Terms
5\tSystems Thinking <\/td>\n<\/tr>\n\n 16<\/td>\n Section sec_6
6\tOverview <\/td>\n<\/tr>\n\n 17<\/td>\n Figure fig_2
Section sec_7
Section sec_7.1
7\tProject Management (PM) process
7.1\tPM purpose <\/td>\n<\/tr>\n\n 18<\/td>\n Section sec_7.2
Section sec_7.3
Table tab_2
Section sec_7.4
Table tab_3
7.2\tPM objectives
7.3\tPM input products
7.4\tPM output products <\/td>\n<\/tr>\n\n 19<\/td>\n Section sec_7.5
Table tab_4
Section sec_7.6
Table tab_5
Section sec_7.7
7.5\tPM internal products
7.6\tPM roles involved
7.7\tPM diagram <\/td>\n<\/tr>\n\n 20<\/td>\n Figure fig_3
Section sec_7.7.1 <\/td>\n<\/tr>\n\n 21<\/td>\n Section sec_7.7.1.1
Table tab_6 <\/td>\n<\/tr>\n\n 24<\/td>\n Section sec_7.7.1.2
Table tab_7 <\/td>\n<\/tr>\n\n 26<\/td>\n Section sec_7.7.1.3
Table tab_8 <\/td>\n<\/tr>\n\n 27<\/td>\n Section sec_7.7.1.4 <\/td>\n<\/tr>\n \n 28<\/td>\n Table tab_9
Section sec_7.7.2
Table tab_10
Section sec_8
Section sec_8.1
Section sec_8.2
8\tSystem Definition and Realization (SR) process
8.1\tSR purpose
8.2\tSR objectives <\/td>\n<\/tr>\n\n 29<\/td>\n Section sec_8.3
Table tab_11
Section sec_8.4
Table tab_12
Section sec_8.5
Table tab_13
8.3\tSR input products
8.4\tSR output products
8.5\tSR internal products <\/td>\n<\/tr>\n\n 30<\/td>\n Section sec_8.6
Table tab_14
Section sec_8.7
8.6\tSR roles involved
8.7\tSR diagram <\/td>\n<\/tr>\n\n 31<\/td>\n Figure fig_4
Section sec_8.7.1 <\/td>\n<\/tr>\n\n 32<\/td>\n Section sec_8.7.1.1
Table tab_15
Section sec_8.7.1.2 <\/td>\n<\/tr>\n\n 33<\/td>\n Table tab_16 <\/td>\n<\/tr>\n \n 36<\/td>\n Section sec_8.7.1.3 <\/td>\n<\/tr>\n \n 37<\/td>\n Table tab_17 <\/td>\n<\/tr>\n \n 39<\/td>\n Section sec_8.7.1.4 <\/td>\n<\/tr>\n \n 40<\/td>\n Table tab_18
Section sec_8.7.1.5 <\/td>\n<\/tr>\n\n 41<\/td>\n Table tab_19 <\/td>\n<\/tr>\n \n 42<\/td>\n Section sec_8.7.1.6 <\/td>\n<\/tr>\n \n 43<\/td>\n Table tab_20 <\/td>\n<\/tr>\n \n 44<\/td>\n Section sec_8.7.2
Table tab_21
Section sec_9
9\tRoles <\/td>\n<\/tr>\n\n 45<\/td>\n Table tab_22 <\/td>\n<\/tr>\n \n 46<\/td>\n Section sec_10
Table tab_23
10\tProduct description <\/td>\n<\/tr>\n\n 59<\/td>\n Section sec_11
Section sec_11.1
11\tSystem tools requirements
11.1\tSystem tools requirements overview <\/td>\n<\/tr>\n\n 60<\/td>\n Section sec_11.2
Table tab_24
Section sec_11.3
Table tab_25
11.2\tProject Management process
11.3\tSystem Definition and Realization process <\/td>\n<\/tr>\n\n 61<\/td>\n Annex sec_A
Table tab_A.1
Annex\u00a0A
\n(informative)<\/p>\n\n 63<\/td>\n Annex sec_B
Annex sec_B.1
Annex\u00a0B
\n(informative)<\/p>\n\n 65<\/td>\n Annex sec_B.2 <\/td>\n<\/tr>\n \n 68<\/td>\n Reference ref_1
Reference ref_2
Reference ref_3
Reference ref_4
Reference ref_5
Reference ref_6
Reference ref_7
Reference ref_8
Reference ref_9
Reference ref_10
Reference ref_11
Reference ref_12
Reference ref_13
Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"\n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2014<\/td>\n 72<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":346857,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-346853","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/346853","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/346857"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=346853"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=346853"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=346853"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}