{"id":401285,"date":"2024-10-20T04:55:37","date_gmt":"2024-10-20T04:55:37","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-b30-23-2022\/"},"modified":"2024-10-26T08:42:48","modified_gmt":"2024-10-26T08:42:48","slug":"asme-b30-23-2022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-b30-23-2022\/","title":{"rendered":"ASME B30.23 2022"},"content":{"rendered":"
The ASME B30 Standard contains provisions that apply to the construction, installation, operation, inspection, testing, maintenance, and use of cranes and other lifting and material-movement-related equipment.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | ASME B30 COMMITTEE ROSTER <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | B30 STANDARD INTRODUCTION <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | ASME B30.23-2022 SUMMARY OF CHANGES <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Chapter 23-0 Scope, Definitions, and References SECTION 23-0.1: SCOPE OF ASME B30.23 SECTION 23-0.2: INTENT OF ASME B30.23 SECTION 23-0.3: DEFINITIONS <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | SECTION 23-0.4: PERSONNEL COMPETENCE SECTION 23-0.5: REFERENCES <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Chapter 23-1 Construction and Characteristics SECTION 23-1.1: DESIGN 23-1.1.1 Personnel Lifting Platform <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 23-1.1.2 Hoisting Equipment SECTION 23-1.2: CONSTRUCTION 23-1.2.1 Personnel Lifting Platform 23-1.2.2 Hoisting Equipment <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Chapter 23-2 Inspection, Testing, and Maintenance SECTION 23-2.1: INSPECTION 23-2.1.1 Personnel Lifting Platform 23-2.1.2 Hoisting Equipment SECTION 23-2.2: TESTING 23-2.2.1 Personnel Lifting Platform <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 23-2.2.2 Hoisting Equipment SECTION 23-2.3: MAINTENANCE 23-2.3.1 Personnel Lifting Platform 23-2.3.2 Hoisting Equipment <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Chapter 23-3 Operation SECTION 23-3.1: PERSONNEL 23-3.1.1 Management 23-3.1.2 Hoisting Equipment Operator <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 23-3.1.3 Ground Crew 23-3.1.4 Personnel Platform Occupants SECTION 23-3.2: PRACTICES 23-3.2.1 Management <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 23-3.2.2 Hoisting Equipment Operator <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 23-3.2.3 Ground Crew 23-3.2.4 Platform Occupants <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 23-3.2.5 Communications <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | MANDATORY APPENDIX I LIFTING PERSONNEL NEAR ELECTRICAL POWER LINES I-1 INTRODUCTION I-2 CONDITION A I-3 CONDITION B <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | I-4 CONDITION C I-5 CONDITION D <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Figures Figure I-1-1 Condition A <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Figure I-1-2 Condition B <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Figure I-1-3 Condition C <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Figure I-1-4 Condition D <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Table Table I-2-1 Required Clearance for Normal Voltage in Operation Near High-Voltage Power Lines and Operation in Transit With No Load and Boom or Mast Lowered \u2003 <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | MANDATORY APPENDIX II PERSONNEL PLATFORM LIFT PLANNING AND AUTHORIZATION FORM <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | MANDATORY APPENDIX III PERSONNEL LIFT PLATFORM PRE-LIFT INSPECTION <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ASME B30.23-2022 Personnel Lifting Systems<\/b><\/p>\n |