AWWA C229 2008
$75.83
AWWA C229-08: Fusion-Bonded Polyethylene Coating For The Exterior Of Steel Water Pipelines
Published By | Publication Date | Number of Pages |
AWWA | 2008 | 28 |
Materials and application requirements for factory-applied, fuision-bonded polyethylene coating used on the exterior of steel water pipels and fittings and the joint region of rubber-gasket field-jointed steel water pipes and fittings.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ANSI/AWWA C229-08 |
3 | Committee Personnel |
7 | Contents |
9 | Foreword I. Introduction. |
10 | II. Special Issues. |
11 | III. Use of This Standard. IV. Major Revisions. V. Comments. |
13 | AWWA Standard Fusion-Bonded Polyethylene Coating for the Exterior of Steel Water Pipelines SECTION 1: GENERAL Sec. 1.1 Scope Sec. 1.2 Purpose |
14 | Sec. 1.3 Application SECTION 2: REFERENCES |
15 | SECTION 3: DEFINITIONS |
16 | SECTION 4: REQUIREMENTS Sec. 4.1 Equipment Sec. 4.2 Materials and Workmanship Sec. 4.3 Laboratory Qualification Tests for the Polyethylene Material and Coating Table 1 Properties of polyethylene material |
17 | Table 2 Properties of laboratory applied coating Sec. 4.4 Coating Application |
19 | Sec. 4.5 Coating Steel Pipe Fittings and Specials Table 3 Properties of production coating |
20 | Sec. 4.6 Coating Repair Sec. 4.7 Field Procedures |
21 | SECTION 5: VERIFICATION Sec. 5.1 Coating-Materials Acceptance Testing |
22 | Sec. 5.2 Inspection and Testing by the Purchaser Sec. 5.3 Laboratory Qualification Tests |
24 | Sec. 5.4 Coating Production Tests |
25 | SECTION 6: DELIVERY Sec. 6.1 Packaging and Marking of Polyethylene Material Sec. 6.2 Pipe Handling, Transport, and Storage |
26 | Sec. 6.3 Affidavit of Compliance |