{"id":28106,"date":"2024-10-17T02:56:23","date_gmt":"2024-10-17T02:56:23","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-manual-73-00-2000\/"},"modified":"2024-10-24T14:01:09","modified_gmt":"2024-10-24T14:01:09","slug":"asce-manual-73-00-2000","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-manual-73-00-2000\/","title":{"rendered":"ASCE Manual 73 00 2000"},"content":{"rendered":"

 This Second Edition of Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors (ASCE Manual No. 73) provides information and recommendations on principles and procedures that are effective in enhancing the quality of constructed projects. This Guide discusses the roles, responsibilities, requirements, and limits of authority of participants in the design and construction process, highlighting concepts and practices that are valuable to each in achieving project goals and objectives. This Guide presents several key themes, including the value of clearly defining and assigning responsibilities, the importance of teamwork, the need for clear contractual provisions, strategies for good communication, the owner\u2019s selection process for other team members, the potential benefits associated with various project delivery systems, and procedures for managing design and construction.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
12<\/td>\nTABLE OF CONTENTS <\/td>\n<\/tr>\n
16<\/td>\nEXECUTIVE SUMMARY <\/td>\n<\/tr>\n
24<\/td>\nCHAPTER 1: INTRODUCTION
1.1 The Members of the Project Team <\/td>\n<\/tr>\n
25<\/td>\n1.2 Team Member Requirements <\/td>\n<\/tr>\n
26<\/td>\n1.3 Team Member Responsibilities <\/td>\n<\/tr>\n
27<\/td>\n1.4 Defining Key Terms <\/td>\n<\/tr>\n
29<\/td>\n1.5 Balancing Team Member Requirements
1.6 The Obligations of Team Members <\/td>\n<\/tr>\n
30<\/td>\n1.7 Principal Themes of This Guide <\/td>\n<\/tr>\n
32<\/td>\nCHAPTER 2: THE OWNER’S ROLE AND REQUIREMENTS
2.1 The Owner’s Role <\/td>\n<\/tr>\n
33<\/td>\n2.2 Project Goals
2.3 Achieving Project Goals
2.4 Establishing Project Objectives <\/td>\n<\/tr>\n
35<\/td>\n2.5 Team Member Requirements
2.6 Timing and Duration of Participation <\/td>\n<\/tr>\n
38<\/td>\nCHAPTER 3: PROJECT DELIVERY SYSTEMS <\/td>\n<\/tr>\n
39<\/td>\n3.1 Owner-Provided Delivery <\/td>\n<\/tr>\n
40<\/td>\n3.2 Traditional Design-Bid-Build <\/td>\n<\/tr>\n
41<\/td>\n3.3 Construction Management <\/td>\n<\/tr>\n
42<\/td>\n3.4 Design-Build <\/td>\n<\/tr>\n
44<\/td>\n3.5 Design-Build Variations <\/td>\n<\/tr>\n
46<\/td>\n3.6 Fast-Tracking: A Distinction <\/td>\n<\/tr>\n
48<\/td>\nCHAPTER 4: THE PROJECT TEAM
4.1 Traditional Team Organization and Variations <\/td>\n<\/tr>\n
49<\/td>\n4.2 The Owner’s Team <\/td>\n<\/tr>\n
52<\/td>\n4.3 The Design Professional’s Team <\/td>\n<\/tr>\n
53<\/td>\n4.4 The Constructor’s Team <\/td>\n<\/tr>\n
54<\/td>\n4.5 Common Interests <\/td>\n<\/tr>\n
56<\/td>\nCHAPTER 5: COORDINATION AND COMMUNICATION
5.1 Key Team Members <\/td>\n<\/tr>\n
57<\/td>\n5.2 Developing Coordination Processes
5.3 Team Member Relationships <\/td>\n<\/tr>\n
59<\/td>\n5.4 Characteristics of Good Communication <\/td>\n<\/tr>\n
63<\/td>\n5.5 Timing and Critical Moments <\/td>\n<\/tr>\n
64<\/td>\n5.6 Frequency of Communication
5.7 Conflict and Disagreement <\/td>\n<\/tr>\n
66<\/td>\nCHAPTER 6: SELECTING THE DESIGN PROFESSIONAL
6.1 Project Goals and the Design Professional’s Scope of Services <\/td>\n<\/tr>\n
67<\/td>\n6.2 Qualifications-Based Selection (QBS) <\/td>\n<\/tr>\n
71<\/td>\n6.3 Competitive Bidding <\/td>\n<\/tr>\n
72<\/td>\n6.4 Two-Envelope Selection <\/td>\n<\/tr>\n
76<\/td>\nCHAPTER 7: AGREEMENT FOR PROFESSIONAL SERVICES <\/td>\n<\/tr>\n
77<\/td>\n7.1 Purpose of the Professional Services Agreement
7.2 Elements of the Agreement <\/td>\n<\/tr>\n
82<\/td>\n7.3 Standard-Form Agreements <\/td>\n<\/tr>\n
83<\/td>\n7.4 Short-Form Agreements <\/td>\n<\/tr>\n
84<\/td>\n7.5 Other Design Contracts <\/td>\n<\/tr>\n
86<\/td>\n7.6 Cautions Concerning Non-Traditional Contracting Relationships <\/td>\n<\/tr>\n
90<\/td>\nCHAPTER 8: ALTERNATIVE STUDIES AND PROJECT IMPACTS <\/td>\n<\/tr>\n
91<\/td>\n8.1 Project Conceptualization
8.2 Existing Conditions and Future Needs Analysis <\/td>\n<\/tr>\n
92<\/td>\n8.3 A Framework for Developing Conceptual Alternatives <\/td>\n<\/tr>\n
93<\/td>\n8.4 Investigating and Selecting Conceptual Alternatives <\/td>\n<\/tr>\n
98<\/td>\n8.5 Environmental Documentation and Permitting <\/td>\n<\/tr>\n
100<\/td>\n8.6 Public Involvement <\/td>\n<\/tr>\n
102<\/td>\nCHAPTER 9: PLANNING AND MANAGING DESIGN
9.1 Organizing for Design <\/td>\n<\/tr>\n
104<\/td>\n9.2 The Design Team <\/td>\n<\/tr>\n
106<\/td>\n9.3 Project Design Guidelines
9.4 Coordination and Communication During Design <\/td>\n<\/tr>\n
107<\/td>\n9.5 Monitoring and Controlling Design Cost and Schedule <\/td>\n<\/tr>\n
110<\/td>\nCHAPTER 10: DESIGN DISCIPLINE COORDINATION
10.1 Levels of Design Discipline Organization <\/td>\n<\/tr>\n
111<\/td>\n10.2 Design Disciplines and Project Objectives <\/td>\n<\/tr>\n
114<\/td>\n10.3 General Design Team Coordination Considerations <\/td>\n<\/tr>\n
115<\/td>\n10.4 Role of the Professional Discipline Leader During Design <\/td>\n<\/tr>\n
116<\/td>\n10.5 Role of the Design Professional During Construction <\/td>\n<\/tr>\n
118<\/td>\nCHAPTER 11: GUIDELINES FOR DESIGN
11.1 Office Operation <\/td>\n<\/tr>\n
120<\/td>\n11.2 Design Procedures <\/td>\n<\/tr>\n
121<\/td>\n11.3 Design Activities and Responsibilities <\/td>\n<\/tr>\n
125<\/td>\n11.4 Compliance with Codes and Standards <\/td>\n<\/tr>\n
126<\/td>\n11.5 Regulatory Permits and Approvals
11.6 Public Funding
11.7 Design Responsibility <\/td>\n<\/tr>\n
130<\/td>\nCHAPTER 12: PRE-CONTRACT PLANNING FOR CONSTRUCTION
12.1 Assessing the Owner’s Capabilities <\/td>\n<\/tr>\n
131<\/td>\n12.2 Resources for Quality Construction <\/td>\n<\/tr>\n
134<\/td>\n12.3 Regulatory Requirements
12.4 Site Development <\/td>\n<\/tr>\n
135<\/td>\n12.5 Reviewing Design and Construction Alternatives <\/td>\n<\/tr>\n
136<\/td>\n12.6 Construction Contract Arrangements <\/td>\n<\/tr>\n
138<\/td>\nCHAPTER 13: THE CONSTRUCTION TEAM
13.1 Assembling the Construction Team <\/td>\n<\/tr>\n
139<\/td>\n13.2 Contracting Strategies and Team Organization <\/td>\n<\/tr>\n
140<\/td>\n13.3 On-site Construction Team Representatives <\/td>\n<\/tr>\n
144<\/td>\n13.4 Construction Specialty Advisers <\/td>\n<\/tr>\n
146<\/td>\nCHAPTER 14: PROCEDURES FOR SELECTING THE CONSTRUCTOR
14.1 Selection Procedures and Qualifications <\/td>\n<\/tr>\n
147<\/td>\n14.2 Constructor Qualifications <\/td>\n<\/tr>\n
148<\/td>\n14.3 Selection By Competitive Bidding <\/td>\n<\/tr>\n
151<\/td>\n14.4 Selection Procedures for Competitive Negotiated Contracts <\/td>\n<\/tr>\n
152<\/td>\n14.5 Selection Procedures for Noncompetitive Negotiated Contracts <\/td>\n<\/tr>\n
154<\/td>\nCHAPTER 15: THE CONSTRUCTION CONTRACT
15.1 Functions of the Construction Contract Relating to Quality <\/td>\n<\/tr>\n
155<\/td>\n15.2 Role of the Design Professional in the Construction Contract
15.3 Defining and Preparing the Construction Contract Documents <\/td>\n<\/tr>\n
156<\/td>\n15.4 Industry Standard Construction Contract Documents
15.5 International Construction Contracts <\/td>\n<\/tr>\n
160<\/td>\nCHAPTER 16: PLANNING AND MANAGING CONSTRUCTION
16.1 Organizing for Construction <\/td>\n<\/tr>\n
162<\/td>\n16.2 Pre-Construction Meetings <\/td>\n<\/tr>\n
164<\/td>\n16.3 Construction Activities <\/td>\n<\/tr>\n
168<\/td>\n16.4 Coordination and Communication <\/td>\n<\/tr>\n
172<\/td>\nCHAPTER 17: CONSTRUCTION CONTRACT DOCUMENTATION AND SUBMITTALS
17.1 Roles and Coordination <\/td>\n<\/tr>\n
176<\/td>\n17.2 Contract Documentation <\/td>\n<\/tr>\n
177<\/td>\n17.3 Technical Submittals <\/td>\n<\/tr>\n
186<\/td>\nCHAPTER 18: CONSTRUCTION CONTRACT ADMINISTRATION
18.1 Resident Project Representative (RPR) <\/td>\n<\/tr>\n
187<\/td>\n18.2 Quality Objectives <\/td>\n<\/tr>\n
189<\/td>\n18.3 Job Site Safety
18.4 Payment <\/td>\n<\/tr>\n
194<\/td>\n18.5 Constructor Submittals
18.6 Change Orders <\/td>\n<\/tr>\n
195<\/td>\n18.7 Coordination of Activities
18.8 Documentation <\/td>\n<\/tr>\n
200<\/td>\nCHAPTER 19: OPERATION AND MAINTENANCE
19.1 Achieving Quality in O&M <\/td>\n<\/tr>\n
201<\/td>\n19.2 O&M During Planning and Design <\/td>\n<\/tr>\n
202<\/td>\n19.3 O&M During Construction <\/td>\n<\/tr>\n
203<\/td>\n19.4 O&M During Start-Up <\/td>\n<\/tr>\n
205<\/td>\n19.5 Operation <\/td>\n<\/tr>\n
208<\/td>\nCHAPTER 20: QUALITY ASSURANCE AND QUALITY CONTROL
20.1 The Owner’s Role <\/td>\n<\/tr>\n
209<\/td>\n20.2 The Design Professional’s QA\/QC Process <\/td>\n<\/tr>\n
212<\/td>\n20.3 The Constructor’s QA\/QC Process <\/td>\n<\/tr>\n
216<\/td>\nCHAPTER 21: COMPUTERS AND PROJECT QUALITY
21.1 Common Computer Uses <\/td>\n<\/tr>\n
218<\/td>\n21.2 Computers and the Owner <\/td>\n<\/tr>\n
219<\/td>\n21.3 Computers and the Design Professional <\/td>\n<\/tr>\n
221<\/td>\n21.4 Computers and the Constructor <\/td>\n<\/tr>\n
223<\/td>\n21.5 Internet Resources <\/td>\n<\/tr>\n
226<\/td>\nCHAPTER 22: PEER REVIEW
22.1 General Features <\/td>\n<\/tr>\n
227<\/td>\n22.2 Types and Benefits of Peer Review <\/td>\n<\/tr>\n
229<\/td>\n22.3 Procedural Elements of Peer Review <\/td>\n<\/tr>\n
233<\/td>\n22.4 Responsibility
22.5 Peer Review Programs and Resources <\/td>\n<\/tr>\n
236<\/td>\nCHAPTER 23: RISK, LIABILITY, AND AVOIDING CONFLICT
23.1 Project Risks <\/td>\n<\/tr>\n
237<\/td>\n23.2 Managing Risk <\/td>\n<\/tr>\n
241<\/td>\n23.3 Risk Management Tools <\/td>\n<\/tr>\n
243<\/td>\n23.4 Liability
23.5 Avoiding Conflict <\/td>\n<\/tr>\n
244<\/td>\n23.6 Conflict Resolution <\/td>\n<\/tr>\n
245<\/td>\n23.7 Litigation <\/td>\n<\/tr>\n
248<\/td>\nCHAPTER 24: PARTNERING
24.1 Benefits of Partnering <\/td>\n<\/tr>\n
251<\/td>\n24.2 Principles of Partnering <\/td>\n<\/tr>\n
252<\/td>\n24.3 Elements of Partnering <\/td>\n<\/tr>\n
257<\/td>\n24.4 Special Applications of Partnering <\/td>\n<\/tr>\n
262<\/td>\nCHAPTER 25: VALUE ENGINEERING
25.1 The Concept of Value
25.2 The Benefits of VE <\/td>\n<\/tr>\n
263<\/td>\n25.3 The Timing of VE Studies <\/td>\n<\/tr>\n
266<\/td>\n25.4 VE Team Composition and Qualifications <\/td>\n<\/tr>\n
267<\/td>\n25.5 Stages of VE Study <\/td>\n<\/tr>\n
273<\/td>\n25.6 Additional VE Considerations <\/td>\n<\/tr>\n
276<\/td>\nGLOSSARY
A
B <\/td>\n<\/tr>\n
277<\/td>\nC <\/td>\n<\/tr>\n
278<\/td>\nD <\/td>\n<\/tr>\n
279<\/td>\nE
F
G
I
L <\/td>\n<\/tr>\n
280<\/td>\nO
P <\/td>\n<\/tr>\n
281<\/td>\nQ <\/td>\n<\/tr>\n
282<\/td>\nR
S <\/td>\n<\/tr>\n
283<\/td>\nT <\/td>\n<\/tr>\n
284<\/td>\nU
V <\/td>\n<\/tr>\n
285<\/td>\nACRONYMS <\/td>\n<\/tr>\n
287<\/td>\nINDEX
A
B
C
D <\/td>\n<\/tr>\n
288<\/td>\nE
F
G
H
I
J
L
M
N
O
P <\/td>\n<\/tr>\n
289<\/td>\nQ
R
S
T
U
V
W <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Manual of Practice No. 73: Quality in the Constructed Project<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASCE<\/b><\/a><\/td>\n2000<\/td>\n289<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":28107,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2660],"product_tag":[],"class_list":{"0":"post-28106","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asce","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/28106","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/28107"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=28106"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=28106"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=28106"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}