{"id":382277,"date":"2024-10-20T03:15:21","date_gmt":"2024-10-20T03:15:21","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-5839-92021-tc\/"},"modified":"2024-10-26T05:55:11","modified_gmt":"2024-10-26T05:55:11","slug":"bs-5839-92021-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-5839-92021-tc\/","title":{"rendered":"BS 5839-9:2021 – TC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | 30443156 <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | A-30416720 <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | Section 1: General 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | 4 Need for an emergency voice communication system <\/td>\n<\/tr>\n | ||||||
101<\/td>\n | 5 Exchange of information and definition of responsibilities <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | 6 Variations from the recommendations of this British Standard <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | Section 2: Design considerations 7 Purpose <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | 8 System circuitry and software <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | 9 Audio and data signal paths <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | 10 Fault monitoring and indication 10.1 Fault conditions <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | 10.2 Fault indications <\/td>\n<\/tr>\n | ||||||
108<\/td>\n | 10.3 Audible fault warning 10.4 Resetting from the fault warning condition 10.5 Monitoring of software-controlled equipment 10.6 Monitoring of memory contents <\/td>\n<\/tr>\n | ||||||
109<\/td>\n | 10.7 System integrity 11 Outstations 11.1 General <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | 11.2 Controls 11.3 Indications <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | 11.4 Electrical performance 11.5 Mechanical details <\/td>\n<\/tr>\n | ||||||
112<\/td>\n | 11.6 Location <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | 11.7 Audio frequency induction loop systems Figure 1 \u2014 Measuring field strength \u2013 plan view <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | Figure 2 \u2014 Measuring field strength \u2013 side view 12 Master stations 12.1 General <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | 12.2 Controls <\/td>\n<\/tr>\n | ||||||
118<\/td>\n | 12.3 Indicators <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | 12.4 Electrical performance <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | 12.5 Mechanical construction 12.6 Location <\/td>\n<\/tr>\n | ||||||
121<\/td>\n | 13 Power supplies <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | 13.1 Recommendations for low voltage mains power supplies <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | 13.2 Recommendations for EVC system power supply units <\/td>\n<\/tr>\n | ||||||
124<\/td>\n | 14 Cables, wiring and other interconnections <\/td>\n<\/tr>\n | ||||||
126<\/td>\n | 15 Wireless-linked EVC systems <\/td>\n<\/tr>\n | ||||||
129<\/td>\n | 16 Environmental conditions <\/td>\n<\/tr>\n | ||||||
130<\/td>\n | 17 Electromagnetic compatibility 18 Electrical safety <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | Section 3: Installation 19 Responsibilities of the installer 20 Installation practices and workmanship <\/td>\n<\/tr>\n | ||||||
133<\/td>\n | 21 Testing of wiring <\/td>\n<\/tr>\n | ||||||
135<\/td>\n | Section 4: Commissioning and handover 22 Commissioning <\/td>\n<\/tr>\n | ||||||
136<\/td>\n | 23 Documentation <\/td>\n<\/tr>\n | ||||||
137<\/td>\n | 24 Certification <\/td>\n<\/tr>\n | ||||||
138<\/td>\n | 25 Acceptance <\/td>\n<\/tr>\n | ||||||
139<\/td>\n | 26 Verification 27 Training <\/td>\n<\/tr>\n | ||||||
141<\/td>\n | Section 5: Maintenance 28 Routine testing 28.1 Recommendations for weekly testing by the user 28.2 Recommendations for monthly attention by the user <\/td>\n<\/tr>\n | ||||||
142<\/td>\n | 29 Inspection and servicing 29.1 Recommendations for quarterly inspection of a vented battery 29.2 Recommendations for six-monthly inspection and test of the system <\/td>\n<\/tr>\n | ||||||
143<\/td>\n | 30 Non-routine attention <\/td>\n<\/tr>\n | ||||||
146<\/td>\n | Section 6: User responsibilities 31 Premises management 32 Logbook <\/td>\n<\/tr>\n | ||||||
147<\/td>\n | Annex A (informative)\u2002 Explanation of access level <\/td>\n<\/tr>\n | ||||||
148<\/td>\n | Annex B (normative)\u2002 Method for calculating standby battery capacity <\/td>\n<\/tr>\n | ||||||
149<\/td>\n | Annex C (normative)\u2002 Modified subclauses from BS EN 54-2:1997+A1 <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | Annex D (informative)\u2002 Model certificates <\/td>\n<\/tr>\n | ||||||
159<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Tracked Changes. Fire detection and fire alarm systems for buildings – Code of practice for the design, installation, commissioning and maintenance of emergency voice communication systems<\/b><\/p>\n |