Shopping Cart

No products in the cart.

AWWA E102 2006 With Erratum 2010

$75.83

AWWA E102-06: Submersible Veritcal Turbine Pumps With Erratum-201001

Published By Publication Date Number of Pages
AWWA 2006 42
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This standard describes minimum requirements for submersible vertical turbine pumps utilizing a discharge column pipe assembly, 5 hp or larger, used in water service, including materials, design, manufacture, inspection, and testing.

PDF Catalog

PDF Pages PDF Title
1 Erratum to ANSI/AWWA E102-06 Standard
3 ANSI/AWWA E102-06
5 Committee Personnel
7 Contents
9 Foreword
I. Introduction.
11 II. Special Issues.
III. Use of This Standard.
13 IV. Comments.
15 AWWA Standard Submersible Vertical Turbine Pumps

SECTION 1: GENERAL
Sec. 1.1 Scope
Sec. 1.2 Purpose
Sec. 1.3 Application
16 SECTION 2: REFERENCES
17 SECTION 3: DEFINITIONS
20 SECTION 4: REQUIREMENTS
Sec. 4.1 Standard Nomenclature
Sec. 4.2 Data Form
Sec. 4.3 Inspection and Certification by Manufacturer
Sec. 4.4 Information to Be Supplied by Manufacturer
Sec. 4.5 Materials and Sanitary Codes
21 Table 1 Standard nomenclature—submersible vertical turbine pumps
22 Table 1 Standard nomenclature—submersible vertical turbine pumps (continued)
23 Table 1 Standard nomenclature—submersible vertical turbine pumps (continued)
24 Table 1 Standard nomenclature—submersible vertical turbine pumps (continued)
25 Sec. 4.6 Submersible Motor
27 Sec. 4.7 Submersible Cable
28 Sec. 4.8 Surface Plate
Sec. 4.9 Strainer
Sec. 4.10 Discharge Pipe
29 Table 2 Diameters and weights of standard discharge column pipe sizes
Sec. 4.11 Pump Bowls
Sec. 4.12 Bowl Bearings
Sec. 4.13 Impellers
30 Sec. 4.14 Wear Rings
Sec. 4.15 Shaft
31 Sec. 4.16 Pump Motor Coupling
Sec. 4.17 Protective Coatings
SECTION 5: VERIFICATION
Sec. 5.1 Inspection
Sec. 5.2 Factory Performance Testing
32 Sec. 5.3 Performance Test
Sec. 5.4 Typical Laboratory Test Arrangement
33 Sec. 5.5 Capacity Measurement
34 Sec. 5.6 Head Measurement
Sec. 5.7 Velocity Head
Sec. 5.8 Power Input to Pump Motor
35 Sec. 5.9 Hydrostatic Tests
Sec. 5.10 Recording and Computation of Test Results
SECTION 6: DELIVERY
Sec. 6.1 Marking
36 Sec. 6.2 Preparation for Shipment
Sec. 6.3 Affidavit of Compliance
37 APPENDIX A Submersible Vertical Turbine Pump Data Form
39 APPENDIX B Engineering Data

SECTION B.1: DISCHARGE COLUMN PIPE
SECTION B.2: FRICTION LOSS
SECTION B.3: DISCHARGE-ELBOW HEAD LOSS
AWWA E102 2006 With Erratum 2010
$75.83