AWWA E102 2006 With Erratum 2010
$75.83
AWWA E102-06: Submersible Veritcal Turbine Pumps With Erratum-201001
Published By | Publication Date | Number of Pages |
AWWA | 2006 | 42 |
This standard describes minimum requirements for submersible vertical turbine pumps utilizing a discharge column pipe assembly, 5 hp or larger, used in water service, including materials, design, manufacture, inspection, and testing.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Erratum to ANSI/AWWA E102-06 Standard |
3 | ANSI/AWWA E102-06 |
5 | Committee Personnel |
7 | Contents |
9 | Foreword I. Introduction. |
11 | II. Special Issues. III. Use of This Standard. |
13 | IV. Comments. |
15 | AWWA Standard Submersible Vertical Turbine Pumps SECTION 1: GENERAL Sec. 1.1 Scope Sec. 1.2 Purpose Sec. 1.3 Application |
16 | SECTION 2: REFERENCES |
17 | SECTION 3: DEFINITIONS |
20 | SECTION 4: REQUIREMENTS Sec. 4.1 Standard Nomenclature Sec. 4.2 Data Form Sec. 4.3 Inspection and Certification by Manufacturer Sec. 4.4 Information to Be Supplied by Manufacturer Sec. 4.5 Materials and Sanitary Codes |
21 | Table 1 Standard nomenclature—submersible vertical turbine pumps |
22 | Table 1 Standard nomenclature—submersible vertical turbine pumps (continued) |
23 | Table 1 Standard nomenclature—submersible vertical turbine pumps (continued) |
24 | Table 1 Standard nomenclature—submersible vertical turbine pumps (continued) |
25 | Sec. 4.6 Submersible Motor |
27 | Sec. 4.7 Submersible Cable |
28 | Sec. 4.8 Surface Plate Sec. 4.9 Strainer Sec. 4.10 Discharge Pipe |
29 | Table 2 Diameters and weights of standard discharge column pipe sizes Sec. 4.11 Pump Bowls Sec. 4.12 Bowl Bearings Sec. 4.13 Impellers |
30 | Sec. 4.14 Wear Rings Sec. 4.15 Shaft |
31 | Sec. 4.16 Pump Motor Coupling Sec. 4.17 Protective Coatings SECTION 5: VERIFICATION Sec. 5.1 Inspection Sec. 5.2 Factory Performance Testing |
32 | Sec. 5.3 Performance Test Sec. 5.4 Typical Laboratory Test Arrangement |
33 | Sec. 5.5 Capacity Measurement |
34 | Sec. 5.6 Head Measurement Sec. 5.7 Velocity Head Sec. 5.8 Power Input to Pump Motor |
35 | Sec. 5.9 Hydrostatic Tests Sec. 5.10 Recording and Computation of Test Results SECTION 6: DELIVERY Sec. 6.1 Marking |
36 | Sec. 6.2 Preparation for Shipment Sec. 6.3 Affidavit of Compliance |
37 | APPENDIX A Submersible Vertical Turbine Pump Data Form |
39 | APPENDIX B Engineering Data SECTION B.1: DISCHARGE COLUMN PIPE SECTION B.2: FRICTION LOSS SECTION B.3: DISCHARGE-ELBOW HEAD LOSS |