{"id":160993,"date":"2024-10-19T09:40:14","date_gmt":"2024-10-19T09:40:14","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-503-7-07-2007\/"},"modified":"2024-10-25T01:58:50","modified_gmt":"2024-10-25T01:58:50","slug":"aci-503-7-07-2007","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-503-7-07-2007\/","title":{"rendered":"ACI 503.7 07 2007"},"content":{"rendered":"
This Specification gives requirements for repairing cracks in concrete by injection of two-component epoxy-resin adhesive. Keywords: adhesive; concrete; crack; epoxy; repair injection; sealer.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | NOTES TO SPECIFIER NOTES TO SPECIFIER PREFACE PREFACE <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | CONTENTS CONTENTS SECTION 1\u2014 GENERAL SECTION 1\u2014 GENERAL 1.1\u2014 Scope 1.1\u2014 Scope 1.2\u2014Definitions 1.2\u2014Definitions 1.3\u2014Reference standards 1.3\u2014Reference standards 1.4\u2014Submittals 1.4\u2014Submittals 1.4.1 Injection adhesives 1.4.1 Injection adhesives 1.4.1.1 Qualification testing 1.4.1.1 Qualification testing 1.4.1.2 Manufacturer\u2019s certification 1.4.1.2 Manufacturer\u2019s certification 1.4.1.3 Additional testing 1.4.1.3 Additional testing 1.5\u2014Quality assurance 1.5\u2014Quality assurance 1.5.1 Metering accuracy 1.5.1 Metering accuracy 1.5.2 Qualification test for metering accuracy 1.5.2 Qualification test for metering accuracy 1.5.2.1 1.5.2.1 <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 1.5.2.1.a 1.5.2.1.a 1.5.2.1.b 1.5.2.1.b 1.5.2.1.c 1.5.2.1.c 1.5.2.1.d 1.5.2.1.d 1.5.2.1.e 1.5.2.1.e 1.5.2.2 1.5.2.2 1.5.3 Qualification tests for mixing effectiveness of \nequipment 1.5.3 Qualification tests for mixing effectiveness of \nequipment 1.5.4 Qualification of injection procedures 1.5.4 Qualification of injection procedures 1.5.4.1 Test injection 1.5.4.1 Test injection 1.5.5 Quality control 1.5.5 Quality control 1.5.5.1 Metering accuracy tests for continuous mixing 1.5.5.1 Metering accuracy tests for continuous mixing 1.5.5.2 Metering accuracy test for batch mixing 1.5.5.2 Metering accuracy test for batch mixing 1.5.5.3 Injection adhesive 1.5.5.3 Injection adhesive 1.5.6 Daily log 1.5.6 Daily log 1.5.7 Acceptance 1.5.7 Acceptance 1.5.7.1 Acceptance criteria 1.5.7.1 Acceptance criteria <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 1.5.7.2 Core testing 1.5.7.2 Core testing 1.6\u2014Delivery and storage of materials 1.6\u2014Delivery and storage of materials 1.6.1 Delivery 1.6.1 Delivery 1.6.2 Storage 1.6.2 Storage 1.7\u2014Safety and environmental precautions 1.7\u2014Safety and environmental precautions 1.7.1 1.7.1 SECTION 2\u2014 MATERIALS SECTION 2\u2014 MATERIALS 2.1\u2014 Surface seal 2.1\u2014 Surface seal 2.2\u2014Injection adhesives 2.2\u2014Injection adhesives 2.2.1 Injection adhesives for cracks that can be sealed on all \nfaces 2.2.1 Injection adhesives for cracks that can be sealed on all \nfaces 2.2.2 Injection adhesives for cracks that cannot be sealed \non all faces 2.2.2 Injection adhesives for cracks that cannot be sealed \non all faces SECTION 3\u2014 EXECUTION SECTION 3\u2014 EXECUTION 3.1\u2014 Evaluation and preparation 3.1\u2014 Evaluation and preparation 3.1.1 Crack width 3.1.1 Crack width 3.1.2 Crack movement 3.1.2 Crack movement 3.1.3 Crack preparation 3.1.3 Crack preparation 3.1.3.1 3.1.3.1 3.1.3.2 Water in cracks 3.1.3.2 Water in cracks 3.1.3.3 Ice in cracks 3.1.3.3 Ice in cracks 3.1.3.4 Temperature of the concrete 3.1.3.4 Temperature of the concrete <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 3.2\u2014Test injection 3.2\u2014Test injection 3.3\u2014Surface sealing 3.3\u2014Surface sealing 3.3.1 Surface seals 3.3.1 Surface seals 3.4\u2014Injection 3.4\u2014Injection 3.4.1 Degree of filling 3.4.1 Degree of filling 3.5\u2014Cleanup 3.5\u2014Cleanup 3.5.1 Surface seal and ports 3.5.1 Surface seal and ports 3.5.2 Spills and leaks 3.5.2 Spills and leaks FOREWORD TO CHECKLISTS FOREWORD TO CHECKLISTS <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | MANDATORY REQUIREMENTS CHECKLIST MANDATORY REQUIREMENTS CHECKLIST OPTIONAL REQUIREMENTS CHECKLIST OPTIONAL REQUIREMENTS CHECKLIST <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | SUBMITTAL CHECKLIST SUBMITTAL CHECKLIST <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" 503.7-07 Specification for Crack Repair by Epoxy Injection<\/b><\/p>\n |