{"id":213853,"date":"2024-10-19T13:51:24","date_gmt":"2024-10-19T13:51:24","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-598-1022003\/"},"modified":"2024-10-25T06:47:46","modified_gmt":"2024-10-25T06:47:46","slug":"bs-598-1022003","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-598-1022003\/","title":{"rendered":"BS 598-102:2003"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nBRITISH STANDARD <\/td>\n<\/tr>\n
2<\/td>\nCommittees responsible for this British Standard <\/td>\n<\/tr>\n
3<\/td>\nContents <\/td>\n<\/tr>\n
7<\/td>\n1 Scope
2 References
2.1 Normative references
2.2 Informative references
3 Terms and definitions
3.1 repeatability (
3.2 reproducibility (
3.3 single test result
3.4 test sieve <\/td>\n<\/tr>\n
8<\/td>\n4 Limits for the repeatability and reproducibility of samples obtained from the same bulk sample
4.1 The limits for the difference between the analysis results of two test samples obtained from …
4.2 The test material for repeatability tests shall be obtained by dividing a sample twice the si…
4.3 The test material for reproducibility tests shall be obtained by first dividing a sample eigh…
Table 1 – Repeatability and reproducibility limits for the analysis of coated macadams
5 Determination of binder content and grading of mineral aggregate
5.1 Extraction bottle method: binder determination by difference <\/td>\n<\/tr>\n
10<\/td>\nTable 2 – Time required for extraction (extraction bottle method: binder determination by difference) \u2014 Min… <\/td>\n<\/tr>\n
11<\/td>\n5.2 Extraction bottle method: binder directly determined <\/td>\n<\/tr>\n
12<\/td>\nFigure 1 – Recovery apparatus showing necessary features <\/td>\n<\/tr>\n
14<\/td>\nTable 3 – Time required for extraction (extraction bottle method: binder directly determined)
Figure 2 – Acceleration\/time relationship for centrifuges <\/td>\n<\/tr>\n
17<\/td>\n5.3 Hot extractor method <\/td>\n<\/tr>\n
20<\/td>\nFigure 3 – Assembled apparatus for the hot extractor method <\/td>\n<\/tr>\n
21<\/td>\nFigure 4 – Cylindrical container for the hot extractor method <\/td>\n<\/tr>\n
22<\/td>\nFigure 5 – Brazed brass or welded steel pot for the hot extractor method <\/td>\n<\/tr>\n
24<\/td>\n6 Determination of water content
6.1 Apparatus
6.2 Solvent
6.3 Procedure <\/td>\n<\/tr>\n
25<\/td>\n6.4 Calculation and expression of results
6.5 Reporting of results
7 Adjustments of soluble binder content and material passing 0.063 mm test\ufffdsieve found on analysis
7.1 Principles
7.2 Adjustments <\/td>\n<\/tr>\n
26<\/td>\nTable 4 – Adjustments values for base (roadbase), binder course and regulating course asphalt mixtures
Table 5 – Adjustments values for surface course asphalt mixtures excluding 0 % mix <\/td>\n<\/tr>\n
27<\/td>\nTable 6 – Adjustments values for coated macadam base (roadbase) and binder course mixtures where the mid-po…
8 Reporting of results
8.1 Results
8.2 Test reports <\/td>\n<\/tr>\n
28<\/td>\nAnnex A (normative)
Use of a filtering aid
A.1
A.2
A.2.1 Pre-coating the filter
Annex B (informative)
Recommendations for equipment control and calibration
B.1 General
B.2 External calibration
B.3 In-house calibration <\/td>\n<\/tr>\n
29<\/td>\nB.4 Balances and weights
B.4.1
B.4.2
B.4.3
B.4.4
B.5 Volumetric glassware
B.5.1
B.5.2
B.6 Centrifuges
B.6.1
B.6.2
B.6.3
B.7 Pressure gauges
B.7.1
B.7.2
B.8 Stop clocks\/watches
B.9 Thermometry
B.9.1
B.9.2
B.9.3 <\/td>\n<\/tr>\n
30<\/td>\nB.10 Test sieves
B.10.1
B.10.2
B.10.3 <\/td>\n<\/tr>\n
31<\/td>\nB.11 Bottle rotation machines
B.12 Dichloromethane (methylene chloride)
Annex C (informative)
Annex Deleted <\/td>\n<\/tr>\n
32<\/td>\nAnnex D (informative)
Guidance on the determination of binder content and grading of mineral aggregate
D.1
D.2
D.3
D.4
D.5 <\/td>\n<\/tr>\n
33<\/td>\nD.6
Annex E (informative)
Centrifuges
E.1
E.2
E.3
E.4
Annex F (informative)
Recommendations on the use of centrifuges
F.1 Introduction
F.2 Installation
F.3 Training of operators <\/td>\n<\/tr>\n
34<\/td>\nF.4 Precautions to be taken when using centrifuges
F.4.1
F.4.2
F.4.3
F.4.4
F.4.5
F.4.6
F.5 Maintenance
F.5.1
F.5.2
F.5.3
F.5.4
F.6 Procedures after a disruption of the rotation assembly
F.6.1
F.6.2
F.6.3
F.6.4
F.6.5 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Sampling and examination of bituminous mixtures for roads and other paved areas – Analytical test methods<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2004<\/td>\n36<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":213859,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-213853","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/213853","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/213859"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=213853"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=213853"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=213853"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}