{"id":317415,"date":"2024-10-19T21:54:30","date_gmt":"2024-10-19T21:54:30","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-1902-10-21994\/"},"modified":"2024-10-25T20:09:20","modified_gmt":"2024-10-25T20:09:20","slug":"bs-1902-10-21994","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-1902-10-21994\/","title":{"rendered":"BS 1902-10.2:1994"},"content":{"rendered":"
This Section of BS 1902-10 describes a method for determining the standard air flow capacity of investment casting shell moulds, and the inherent permeability of the shell material, at elevated temperatures.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | BRITISH STANDARD <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Committees responsible for this British Standard <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 1 Scope 2 Definitions permeability air flow capacity standard air flow capacity (SAF) 3 Principle 4 Apparatus 4.1 Test equipment 4.2 Air supply 4.3 Pressure regulator 4.4 Thermal mass flow sensor 4.5 Pressure sensor <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 4.6 Test piece temperature indication 4.7 Programmable control furnace Figure 1 – Configuration of test equipment <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Figure 2 – Pressure-tight thermocouple\/T-piece adaptor for thermocouple entry into air stream <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Figure 3 – Detail of T-piece <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Figure 4 – Location of test piece <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 5 Number and form of test pieces 5.1 Number 5.2 Test piece former 5.3 Shelling 5.4 Burn-out <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Figure 5 – Sample former 6 Test procedure Table 1 – Test procedure: possible options 7 Shell characterization: procedure A 7.1 Measurement of shell test pieces 7.2 Connecting test piece to apparatus and performing leak checks <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Figure 6 – Four sample diameter measurement points 7.3 Furnace controller <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 7.4 Test pressure 7.5 Recording data 8 Production\/quality control procedure on a fired shell: procedure B 9 Production\/quality control procedure on an unfired shell: procedure C <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 10 Calculation of results <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 11 Test report <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Annex A (informative) Alternative calculation methods Annex B (informative) Convention for tabular presentation of results Table B.1 – Temperature ramp phase <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Table B.2 – Temperature dwell phase at 1 200 \u00b0C Annex C (informative) Convention of graphical presentation <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Figure C.1 – Example of graphical presentation <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Methods of testing refractory materials. Investment casting shell mould systems – Determination of permeability and standard air flow capacity at elevated temperatures – Section 10.2: Determination of permeability and standard air flow capacity at elevated temperatures<\/b><\/p>\n |