{"id":372210,"date":"2024-10-20T02:28:13","date_gmt":"2024-10-20T02:28:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-22282-42021\/"},"modified":"2024-10-26T04:18:22","modified_gmt":"2024-10-26T04:18:22","slug":"bs-en-iso-22282-42021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-22282-42021\/","title":{"rendered":"BS EN ISO 22282-4:2021"},"content":{"rendered":"
This document establishes requirements for pumping tests as part of geotechnical investigation service in accordance with EN 1997\u20111 and EN 1997\u20112.<\/p>\n
This document applies to pumping tests performed on aquifers whose permeability is such that pumping from a well can create a lowering of the piezometric head within hours or days depending on the ground conditions and the purpose. It covers pumping tests carried out in soils and rock.<\/p>\n
The tests concerned by this document are those intended for evaluating the hydrodynamic parameters of an aquifer and well parameters, such as:<\/p>\n
permeability of the aquifer,<\/p>\n<\/li>\n
radius of influence of pumping,<\/p>\n<\/li>\n
pumping rate of a well,<\/p>\n<\/li>\n
response of drawdown in an aquifer during pumping,<\/p>\n<\/li>\n
skin effect,<\/p>\n<\/li>\n
well storage,<\/p>\n<\/li>\n
response of recovery in an aquifer after pumping.<\/p>\n<\/li>\n<\/ul>\n
This document establishes requirements for pumping tests as part of geotechnical investigation service in accordance with EN 1997\u20111 and EN 1997\u20112.<\/p>\n
This document applies to pumping tests performed on aquifers whose permeability is such that pumping from a well can create a lowering of the piezometric head within hours or days depending on the ground conditions and the purpose. It covers pumping tests carried out in soils and rock.<\/p>\n
The tests concerned by this document are those intended for evaluating the hydrodynamic parameters of an aquifer and well parameters, such as:<\/p>\n
permeability of the aquifer,<\/p>\n<\/li>\n
radius of influence of pumping,<\/p>\n<\/li>\n
pumping rate of a well,<\/p>\n<\/li>\n
response of drawdown in an aquifer during pumping,<\/p>\n<\/li>\n
skin effect,<\/p>\n<\/li>\n
well storage,<\/p>\n<\/li>\n
response of recovery in an aquifer after pumping.<\/p>\n<\/li>\n<\/ul>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | European foreword <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms, definitions and symbols 3.1 Terms and definitions 3.2 Symbols 4 Equipment <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5 Test procedure 5.1 Test preparation 5.1.1 General 5.1.2 Determining the discharge rate for the pumping test 5.2 Arranging the disposal of discharge water <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5.3 Executing and equipping the well 5.3.1 Design of the test well <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.3.2 Installation procedure 5.3.3 Preparation of the well 5.4 Executing and equipping the piezometers 5.4.1 Installation procedure 5.4.2 Preparation of piezometers <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.5 Execution of the test 5.5.1 General 5.5.2 Pre-pumping monitoring 5.5.3 Preliminary pumping phase 5.5.4 Pumping test <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.5.5 Post-pumping monitoring <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.6 Uncertainty of measurement 5.7 Interruptions in pumping 5.8 Decommissioning 6 Test results <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 7 Reports 7.1 Field report 7.1.1 General 7.1.2 Installation record 7.1.3 Record of measured values and test results <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 7.2 Test report <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Annex A (informative) Record of measured values and test results of the pumping test \u2014 Example <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Annex B (informative) Determining the pumping test discharge <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex C (informative) Interpretation of the pumping test results <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Geotechnical investigation and testing. Geohydraulic testing – Pumping tests<\/b><\/p>\n |